MCQOPTIONS
Saved Bookmarks
This section includes 68 Mcqs, each offering curated multiple-choice questions to sharpen your Software Engineering knowledge and support exam preparation. Choose a topic below to get started.
| 51. |
ISO 9001 is not concerned with _______________ of quality records? |
| A. | collection |
| B. | maintenance |
| C. | verification |
| D. | dis-positioning |
| Answer» D. dis-positioning | |
| 52. |
In which stage of process improvement bottlenecks and weaknesses are identified ? |
| A. | Process measurement |
| B. | Process analysis |
| C. | Process change |
| D. | None of the mentioned |
| Answer» C. Process change | |
| 53. |
In CMM, the life cycle activities of requirements analysis, design, code, and test are described in_________________________? |
| A. | Software Product Engineering |
| B. | Software Quality Assurance |
| C. | Software Subcontract Management |
| D. | Software Quality Management |
| Answer» B. Software Quality Assurance | |
| 54. |
In a sociotechnical system, you need to consider reliability from perspectives namely ? |
| A. | only software reliability |
| B. | only hardware reliability |
| C. | hardware and software reliability |
| D. | hardware, software and operator reliability |
| Answer» E. | |
| 55. |
Identify the correct statement with respect to Evolutionary development ? |
| A. | Evolutionary development usually has two flavors; exploratory development, and throw-away prototyping |
| B. | Very large projects are usually done using evolutionary development based approach |
| C. | It facilitates easy project management, through the high volume of documentation it generates |
| D. | Sometimes the construction of a throw-away prototype is not followed by a re- implementation of the software system using a more structured approach |
| Answer» B. Very large projects are usually done using evolutionary development based approach | |
| 56. |
Human and organizational factors such as organizational structure and politics have a significant effect on the operation of sociotechnical systems ? |
| A. | True |
| B. | False |
| Answer» B. False | |
| 57. |
How many stages are there in process improvement ? |
| A. | three |
| B. | four |
| C. | five |
| D. | six |
| Answer» B. four | |
| 58. |
How many stages are there in Iterative-enhancement model used during software maintenance ? |
| A. | two |
| B. | three |
| C. | four |
| D. | five |
| Answer» C. four | |
| 59. |
How many phases are there in Taute Maintenance Model ? |
| A. | six |
| B. | seven |
| C. | eight |
| D. | nine |
| Answer» D. nine | |
| 60. |
Degree to which design specifications are followed in manufacturing the product is called_________________? |
| A. | Quality Control |
| B. | Quality of conformance |
| C. | Quality Assurance |
| D. | None of the mentioned |
| Answer» C. Quality Assurance | |
| 61. |
CSTE stands for ____________________? |
| A. | Certified Software Technology |
| B. | Certified Software Tester |
| C. | Certified Software Trainee |
| D. | None of the mentioned |
| Answer» C. Certified Software Trainee | |
| 62. |
CSQA stands for __________________? |
| A. | Certified Software Quality Analyst |
| B. | Certified Software Quality Approved |
| C. | Certified Software Quality Acclaimed |
| D. | None of the mentioned |
| Answer» B. Certified Software Quality Approved | |
| 63. |
Consider an example of a system which has a police command and control system that may include a geographical information system to provide details of the location of incidents. What kind of system the example represents ? |
| A. | Complex System |
| B. | Technical computer-based system |
| C. | Sociotechnical System |
| D. | Both Complex and Sociotechnical System |
| Answer» E. | |
| 64. |
CO policy in CMM means___________________? |
| A. | The leadership practices in Commitment to Perform |
| B. | The organizational structure (groups) practices in Ability to Perform |
| C. | The policy practices in Commitment to Perform |
| D. | The planning practices in Commitment to Perform |
| Answer» D. The planning practices in Commitment to Perform | |
| 65. |
CMM stands for_____________________? |
| A. | Capability Management Module |
| B. | Conservative Maturity Model |
| C. | Capability Maturity Module |
| D. | Capability Maturity Model |
| Answer» E. | |
| 66. |
Choose the suitable options with respect to regression testing ? |
| A. | It helps in development of software |
| B. | It helps in maintenance of software |
| C. | It helps in development & maintenance of software |
| D. | none of the mentioned |
| Answer» D. none of the mentioned | |
| 67. |
According to ISO 9001, the causes of nonconforming product should be____________________? |
| A. | deleted |
| B. | eliminated |
| C. | identified |
| D. | eliminated and identified |
| Answer» E. | |
| 68. |
A sociotechnical system is a system that includes___________________? |
| A. | people |
| B. | software |
| C. | hardware |
| D. | all of the mentioned |
| Answer» E. | |