Explore topic-wise MCQs in Testing Subject.

This section includes 657 Mcqs, each offering curated multiple-choice questions to sharpen your Testing Subject knowledge and support exam preparation. Choose a topic below to get started.

1.

ISO 9001 is not concerned with _______________ of quality records?

A. collection
B. maintenance
C. verification
D. dis-positioning
Answer» D. dis-positioning
2.

In which stage of process improvement bottlenecks and weaknesses are identified ?

A. Process measurement
B. Process analysis
C. Process change
D. None of the mentioned
Answer» C. Process change
3.

In CMM, the life cycle activities of requirements analysis, design, code, and test are described in_________________________?

A. Software Product Engineering
B. Software Quality Assurance
C. Software Subcontract Management
D. Software Quality Management
Answer» B. Software Quality Assurance
4.

In a sociotechnical system, you need to consider reliability from perspectives namely ?

A. only software reliability
B. only hardware reliability
C. hardware and software reliability
D. hardware, software and operator reliability
Answer» E.
5.

Identify the correct statement with respect to Evolutionary development ?

A. Evolutionary development usually has two flavors; exploratory development, and throw-away prototyping
B. Very large projects are usually done using evolutionary development based approach
C. It facilitates easy project management, through the high volume of documentation it generates
D. Sometimes the construction of a throw-away prototype is not followed by a re- implementation of the software system using a more structured approach
Answer» B. Very large projects are usually done using evolutionary development based approach
6.

Human and organizational factors such as organizational structure and politics have a significant effect on the operation of sociotechnical systems ?

A. True
B. False
Answer» B. False
7.

How many stages are there in process improvement ?

A. three
B. four
C. five
D. six
Answer» B. four
8.

How many stages are there in Iterative-enhancement model used during software maintenance ?

A. two
B. three
C. four
D. five
Answer» C. four
9.

How many phases are there in Taute Maintenance Model ?

A. six
B. seven
C. eight
D. nine
Answer» D. nine
10.

Degree to which design specifications are followed in manufacturing the product is called_________________?

A. Quality Control
B. Quality of conformance
C. Quality Assurance
D. None of the mentioned
Answer» C. Quality Assurance
11.

CSTE stands for ____________________?

A. Certified Software Technology
B. Certified Software Tester
C. Certified Software Trainee
D. None of the mentioned
Answer» C. Certified Software Trainee
12.

CSQA stands for __________________?

A. Certified Software Quality Analyst
B. Certified Software Quality Approved
C. Certified Software Quality Acclaimed
D. None of the mentioned
Answer» B. Certified Software Quality Approved
13.

Consider an example of a system which has a police command and control system that may include a geographical information system to provide details of the location of incidents. What kind of system the example represents ?

A. Complex System
B. Technical computer-based system
C. Sociotechnical System
D. Both Complex and Sociotechnical System
Answer» E.
14.

CO policy in CMM means___________________?

A. The leadership practices in Commitment to Perform
B. The organizational structure (groups) practices in Ability to Perform
C. The policy practices in Commitment to Perform
D. The planning practices in Commitment to Perform
Answer» D. The planning practices in Commitment to Perform
15.

CMM stands for_____________________?

A. Capability Management Module
B. Conservative Maturity Model
C. Capability Maturity Module
D. Capability Maturity Model
Answer» E.
16.

Choose the suitable options with respect to regression testing ?

A. It helps in development of software
B. It helps in maintenance of software
C. It helps in development & maintenance of software
D. none of the mentioned
Answer» D. none of the mentioned
17.

According to ISO 9001, the causes of nonconforming product should be____________________?

A. deleted
B. eliminated
C. identified
D. eliminated and identified
Answer» E.
18.

A sociotechnical system is a system that includes___________________?

A. people
B. software
C. hardware
D. all of the mentioned
Answer» E.