| 1. |
What can be the remedial measure adopted for track level variations due to inadequate drainage due to high cess? |
| A. | Improving side drainage by lowering the cess |
| B. | Treatment with lime slurry pressure injection |
| C. | Cement grouting |
| D. | Cationic bituminous emulsion below ballast |
| Answer» B. Treatment with lime slurry pressure injection | |
| 2. |
What can be done to reduce creep of soil? |
| A. | Providing turfing |
| B. | Providing mats |
| C. | Providing side berms |
| D. | Cement grouting |
| Answer» D. Cement grouting | |
| 3. |
What is obtained to get an idea of the Track maintainability? |
| A. | Number of visits to track |
| B. | Site details |
| C. | Ballast penetration profiles |
| D. | History of affected section |
| Answer» B. Site details | |
| 4. |
Which of the following is not included in the data regarding the history of the affected section? |
| A. | Method of Construction |
| B. | Date of opening to Traffic |
| C. | Drainage conditions |
| D. | Speed restrictions |
| Answer» D. Speed restrictions | |