151. |
Which of the following criterion is not used for decision making under uncertainty? |
A. | maximin |
B. | maximax |
C. | minimax |
D. | minimize expected loss |
Answer» E. | |
152. |
The minimum EOL will always result in the same decision as |
A. | minimax |
B. | maximin |
C. | maximum emv |
D. | maximax |
Answer» D. maximax | |
153. |
Decision theory is concerned with |
A. | methods of arriving at an optimal decision |
B. | selecting optimal decision in sequential manner |
C. | analysis of information that is available |
D. | all of the above |
Answer» E. | |
154. |
Which of the following might be viewed as an optimistic decision criterion? |
A. | hurwicz criterion |
B. | maximin |
C. | maximax |
D. | minimax |
Answer» D. minimax | |
155. |
The maximax criteria is…….. |
A. | optimistic |
B. | neutral |
C. | pessimistic |
D. | can be any one of the above |
Answer» D. can be any one of the above | |
156. |
The criteria of expected monetary value is used for making decisions under |
A. | certainty |
B. | uncertainty |
C. | risk |
D. | all of the above |
Answer» E. | |
157. |
Opportunity loss refers to |
A. | the expected value of a bad decision |
B. | the expected loss from a bad decision |
C. | the difference between actual pay off and the optimal pay off |
D. | the regret from not having made a decision |
Answer» D. the regret from not having made a decision | |
158. |
The equally likely decision criteria is also known as |
A. | bayes |
B. | laplace |
C. | minimax |
D. | hurwicz |
Answer» C. minimax | |
159. |
All of the following are steps in the decision-making process EXCEPT |
A. | define the problem |
B. | list alternatives |
C. | identify the possible outcomes |
D. | compute the posterior probabilities. |
Answer» E. | |
160. |
A good decision always implies that |
A. | will obtain the best final results |
B. | have used appropriate quantitative analysis. |
C. | have considered all alternatives |
D. | have followed a logical process. |
Answer» E. | |
161. |
Which of the following is (are) types of decision-making environments? |
A. | decision making under uncertainty |
B. | decision making under certainty |
C. | decision making under risk |
D. | none of the above |
Answer» C. decision making under risk | |
162. |
What decision-making condition must exist for the decision tree to be a valuable tool? |
A. | certainty |
B. | uncertainty |
C. | risk |
D. | it does not matter, the tool is appropriate in all environments |
Answer» D. it does not matter, the tool is appropriate in all environments | |
163. |
For decision making under uncertainty, identify the decision rule that is appropriatefor the optimist. |
A. | laplace |
B. | maximax |
C. | minimax regret |
D. | maxmin |
Answer» C. minimax regret | |
164. |
In a decision theory problem under complete uncertainty, which one of the followingapproaches will not be possible? |
A. | expected monetary value |
B. | maxmin |
C. | minimax |
D. | hurwicz |
Answer» B. maxmin | |
165. |
If a decision theory problem has 3 decision alternatives and 4 states of nature, thenumber of payoffs in that problem will be |
A. | 3 |
B. | 4 |
C. | 12 |
D. | 64 |
Answer» D. 64 | |
166. |
Which of the following is not a part of decision tree problem specification? |
A. | a list of alternatives |
B. | a list of possible state of nature |
C. | evpi |
D. | pay off associated with alternative/ state of nature combination. |
Answer» D. pay off associated with alternative/ state of nature combination. | |
167. |
………is the shortest possible time in which an activity can be delayed withoutdelaying the project. |
A. | pessimistic time estimate |
B. | optimistic time estimate |
C. | most likely time estimate |
D. | none of these |
Answer» C. most likely time estimate | |
168. |
………… is the duration by which an activity can be delayed without delaying theproject. |
A. | total float |
B. | slack |
C. | earliest event time |
D. | none of these |
Answer» B. slack | |
169. |
…………..is an activity oriented diagram. |
A. | cpm |
B. | pert |
C. | histogram |
D. | none of the above |
Answer» B. pert | |
170. |
…….is the disconnection of an activity before the completion of activities in a projectnetwork diagram. |
A. | dangling |
B. | looping |
C. | dummy |
D. | none of the above |
Answer» D. none of the above | |
171. |
The event is commonly represented by …… in network diagram |
A. | nodes |
B. | arrow |
C. | triangle |
D. | none of these |
Answer» B. arrow | |
172. |
An activity which must be completed before one or more other activities start is knownas …………activity. |
A. | dummy |
B. | predecessor |
C. | successor |
D. | none of these |
Answer» C. successor | |
173. |
…….. is a scheme or design of something intended or device. |
A. | programme |
B. | project |
C. | network |
D. | float |
Answer» D. float | |
174. |
Full form of PERT is |
A. | performance evaluation review technique |
B. | programme evaluation review technique |
C. | programme evaluation research technique |
D. | none of these. |
Answer» B. programme evaluation review technique | |
175. |
………. is event oriented. |
A. | cpm |
B. | pert |
C. | lp |
D. | none of the above |
Answer» C. lp | |
176. |
PERT emphasis on ……….. |
A. | time |
B. | activity |
C. | and b) |
D. | none of the above |
Answer» B. activity | |
177. |
……….is activity oriented. |
A. | cpm |
B. | pert |
C. | lp |
D. | none of the above |
Answer» B. pert | |
178. |
……………is the duration by which an activity can be delayed without delaying theproject |
A. | slack |
B. | total float |
C. | free float |
D. | independent float |
Answer» C. free float | |
179. |
……… is the time by which the completion of an activity can be delayed beyond itsearliest finish time without affecting the earliest start time of a succeeding activity |
A. | slack |
B. | total float |
C. | free float |
D. | independent float |
Answer» D. independent float | |
180. |
……….is the latest time by which an activity can be finished without delaying thecompletion of the project. |
A. | est |
B. | eft |
C. | lst |
D. | lft |
Answer» E. | |
181. |
………. is the latest time by which an activity can be started without delaying thecompletion of the project. |
A. | est |
B. | eft |
C. | lst |
D. | lft |
Answer» D. lft | |
182. |
………… is the earliest starting time plus activity time. |
A. | est |
B. | eft |
C. | lst |
D. | lft |
Answer» C. lst | |
183. |
It ………. at which an activity can start. |
A. | est |
B. | eft |
C. | lst |
D. | lft |
Answer» B. eft | |
184. |
………..is that sequence of activities which determines the total project time. |
A. | net work |
B. | critical path |
C. | critical activities |
D. | none of the above |
Answer» C. critical activities | |
185. |
Activities lying on the critical path are called…………. |
A. | net work |
B. | critical path |
C. | critical activities |
D. | none of the above |
Answer» D. none of the above | |
186. |
While solving an LP problem, infeasibility may be removed by |
A. | adding another constraint |
B. | adding another variable |
C. | removing a constraint |
D. | removing a variable |
Answer» D. removing a variable | |
187. |
Alternative solutions exists of an LP model when |
A. | one of the constraints is redundant. |
B. | objective function equation is parallel to one of the constraints |
C. | two constraints are parallel. |
D. | all of the above |
Answer» C. two constraints are parallel. | |
188. |
Constraint in LP problem are called active if they |
A. | represent optimal solution |
B. | at optimality do not consume all the available resources |
C. | both of (a) and (b) |
D. | none of the above |
Answer» B. at optimality do not consume all the available resources | |
189. |
If two constraints do not intersect in the positive quadrant of the graph, then |
A. | the problem is infeasible |
B. | the solution is unbounded |
C. | one of the constraints is redundant |
D. | none of the above |
Answer» E. | |
190. |
An event which represents the beginning of more than one activity is known as………..event. |
A. | merge |
B. | net |
C. | burst |
D. | none of the above |
Answer» D. none of the above | |
191. |
………. is a series of related activities which result in some product or services. |
A. | network |
B. | transportation model |
C. | assignment |
D. | none of these |
Answer» B. transportation model | |
192. |
In linear programming problem if all constraints are less than or equal to, then thefeasible region is |
A. | above lines |
B. | below the lines |
C. | unbounded |
D. | none of the above |
Answer» C. unbounded | |
193. |
Straight lines shown in a linear programming graph indicates |
A. | objective function |
B. | constraints |
C. | points |
D. | all the above |
Answer» C. points | |
194. |
All negative constraints must be written as |
A. | equality |
B. | non equality |
C. | greater than or equal to |
D. | less than or equal to |
Answer» D. less than or equal to | |
195. |
Which of the following may not be in a linear programming formulation? |
A. | <=. |
B. | >. |
C. | 0 |
D. | all the above |
Answer» C. 0 | |
196. |
While solving an LP problem infeasibility may be removed by |
A. | adding another constraint |
B. | adding another variable |
C. | removing a constraint |
D. | removing a variable |
Answer» D. removing a variable | |
197. |
A linear programming model does not contain which of the following components? |
A. | data |
B. | decisions |
C. | constraints |
D. | a spread sheet |
Answer» E. | |
198. |
Which of the following is not a category of linear programming problems? |
A. | resource allocation problem |
B. | cost benefit trade off problem |
C. | distribution network problem |
D. | all of the above are categories of linear programming problems. |
Answer» E. | |
199. |
While solving LP problem graphically, the area bounded by the constraints is called |
A. | feasible region |
B. | infeasible region |
C. | unbounded solution |
D. | none of the above |
Answer» B. infeasible region | |
200. |
The solution space of a LP problem is unbounded due to |
A. | an incorrect formulation of the lp model |
B. | objective function is unbounded |
C. | neither (a) nor (b) |
D. | both (a) and (b) |
Answer» D. both (a) and (b) | |