Explore topic-wise MCQs in Civil Engineering Drawing.

This section includes 9 Mcqs, each offering curated multiple-choice questions to sharpen your Civil Engineering Drawing knowledge and support exam preparation. Choose a topic below to get started.

1.

In the construction industry ____________ is a very general term which refers to organisations contracted as part of the delivery of a built asset.

A. transporter
B. supplier
C. organisation
D. industry
Answer» C. organisation
2.

______________ is the most high risk activity in the construction sector.

A. Shuttering
B. Demolition
C. Pointing
D. Plastering
Answer» C. Pointing
3.

What is the schedule rate for Shisham wood in Lucknow?

A. Rs.380/cu m
B. Rs.11000/cu m
C. Rs.12080/cu m
D. Rs.2300/cu m
Answer» C. Rs.12080/cu m
4.

What is the schedule rate for a Riveter in Lucknow?

A. Rs.140
B. Rs.500
C. Rs.350
D. Rs.80
Answer» D. Rs.80
5.

Which among the following is not an advantage of schedule of rates?

A. The client can stop and start work at a pace that might be determined by cash flow or funding
B. It is flexible in relation to scope and contractual commitment
C. A larger pool of contractors can be asked to tender as the process is inexpensive and quick
D. Additional resources are required to measure work and certify payments
Answer» E.
6.

What is the schedule rate for a Glazier in Lucknow?

A. Rs.50
B. Rs.350
C. Rs.320
D. Rs.120
Answer» D. Rs.120
7.

What is the schedule rate for a road roller including POL in Lucknow?

A. Rs.200
B. Rs.1000
C. Rs.2000
D. Rs.450
Answer» C. Rs.2000
8.

In its most simple form, a _______________ can be a list in a contract setting out the staff, labour and plant hire rates the contractor will use for pricing cost reimbursable instructed daywork.

A. list
B. plan
C. scheme
D. schedule of rates
Answer» B. plan
9.

What is the schedule rate for a Blacksmith in Lucknow?

A. Rs.350
B. Rs.150
C. Rs.30
D. Rs.150
Answer» B. Rs.150