1.

Viscosity builders have to be used in a huge amount in gravel packing.

A. True
B. False
Answer» C.
2.

How the flow velocity is calculated in the context of gravel packing?

A. Production rate ft3/sec / 50% of the open area of slots 50%
B. Production rate ft3/sec / 100% of the open area of slots 50%
C. Production rate ft3/sec / 60% of the open area of slots 50%
D. Production rate ft3/sec / 80% of the open area of slots 50%
Answer» B. Production rate ft3/sec / 100% of the open area of slots 50%
3.

Which of the following is correct in the context of gravel – sand size ratio when the uniformity coefficient is greater than 5; consider flow velocity is less than 0.05 ft/sec?

A. D10 gravel = 7 times D10 sand size
B. D40 gravel = 8 times D40 sand size
C. D10 gravel = 8 times D40 sand size
D. D40 gravel = 6 times 40 sand size
Answer» E.
4.

Which of the following is correct in the context of gravel – sand size ratio when the uniformity coefficient is less than 5; consider flow velocity is less than 0.05 ft/sec?

A. D10 gravel = 7 times D10 sand size
B. D10 gravel = 8 times D10 sand size
C. D10 gravel = 6 times D10 sand size
D. D10 gravel = 4 times D10 sand size
Answer» D. D10 gravel = 4 times D10 sand size
5.

Using a slotted liner or screen without gravel is always recommended.

A. True
B. False
Answer» C.