MCQOPTIONS
Saved Bookmarks
This section includes 11 Mcqs, each offering curated multiple-choice questions to sharpen your Hazardous Waste Management knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
Solidification of HW is done at TSDF to reduce ________ |
| A. | Area |
| B. | Volume |
| C. | Analysis |
| D. | Record keeping |
| Answer» C. Analysis | |
| 2. |
The design of TSDF facilities should follow __________ guidelines. |
| A. | CPCB |
| B. | PCB |
| C. | SPCB |
| D. | LPCB |
| Answer» B. PCB | |
| 3. |
External safety audit at an incinerator facility is carried out once in _____ year. |
| A. | 1 |
| B. | 2 |
| C. | 3 |
| D. | 4 |
| Answer» C. 3 | |
| 4. |
Storage of incinerable hazardous waste at the site is ______ months. |
| A. | 2 |
| B. | 4 |
| C. | 6 |
| D. | 8 |
| Answer» D. 8 | |
| 5. |
What type of waste does Subtitle D of RCRA regulate? |
| A. | Solid hazardous waste |
| B. | Chemical hazardous waste |
| C. | Non-hazardous solid waste |
| D. | D. Radioactive waste |
| Answer» D. D. Radioactive waste | |
| 6. |
Transporters of hazardous waste does not require RCRA permit. |
| A. | True |
| B. | False |
| Answer» B. False | |
| 7. |
Permits are typically granted for a period up to ____ years. |
| A. | 7 |
| B. | 8 |
| C. | 9 |
| D. | 10 |
| Answer» E. | |
| 8. |
RCRA permits require facilities to develop emergency plans. |
| A. | False |
| B. | True |
| Answer» C. | |
| 9. |
TSDFs has to obtain permission in the form of ___________ permit. |
| A. | CERCLA |
| B. | SARA |
| C. | RCRA |
| D. | HPL |
| Answer» D. HPL | |
| 10. |
The unit-specific design is required to __________ |
| A. | Prevent the release of HW |
| B. | Good housekeeping |
| C. | Analysis |
| D. | Export activities |
| Answer» B. Good housekeeping | |
| 11. |
The final step in RCRA s cradle-to-grave concept is ___________ |
| A. | Disposal |
| B. | TSDF |
| C. | STDF |
| D. | TSFF |
| Answer» C. STDF | |