

MCQOPTIONS
Saved Bookmarks
This section includes 2 Mcqs, each offering curated multiple-choice questions to sharpen your Software Engineering knowledge and support exam preparation. Choose a topic below to get started.
1. |
According to a statistical report: over 30% of all software projects are cancelled before completion and over 70% of the remainder fail to deliver expected features . What must be the reason for such a situation ? |
A. | Poor change management |
B. | Poor requirements management |
C. | Poor quality control |
D. | All of the mentioned |
Answer» C. Poor quality control | |
2. |
What functionality of Requirement Management Tool (RMT) is depicted by the statement: the tool should be able to automatically detect relations between artifacts. For example information retrieval techniques, monitoring of change history, naming schemas or model transformations. |
A. | Automatic Link Detection |
B. | Documentation Support |
C. | Graphical Representation |
D. | Automatic Link Creation and Change |
Answer» B. Documentation Support | |