This section includes 239 Mcqs, each offering curated multiple-choice questions to sharpen your Dairy Engineering knowledge and support exam preparation. Choose a topic below to get started.

101.

The main goal of quality assurance is:

A. Set coding standards.
B. Improve software project management
C. Reduce the technical and programmatic risks in developing the software
D. Specify corrective actions.
Answer» D. Specify corrective actions.
102.

Name the events that will be analyzed, Count the named incidents, Rank the count by frequency using a bar chart & Validate reasonableness of the analysis is called as

A. Pareto Analysis
B. Cause and Effect Diagram
C. SWOT Analysis
D. Pie Charts
Answer» B. Cause and Effect Diagram
103.

A quality circle holds a brainstorming session and attempts to identify the factors responsible for flaws in a product. Which tool do you suggest they use to organize their findings?

A. Ishikawa diagram
B. Pareto chart
C. Process chart
D. Control charts
Answer» B. Pareto chart
104.

The degree to which the design specifications are followed during manufacturing is known as

A. Quality of design
B. Quality of conformance
C. Quality of testing
D. None of the mentioned
Answer» B. Quality of conformance
105.

Reporting Discrepancies as incidents is a part of which phase:

A. Test Analysis and Design
B. Test Implementation and execution
C. Test Closure Activities
D. Evaluating exit criteria and reporting
Answer» E.
106.

The testing which is done by going through the code is known as,

A. Unit Testing
B. Black Box testing
C. White box Testing
D. Regression testing
Answer» D. Regression testing
107.

Which of the following is not a type of coding defect?

A. Initialisation defects
B. Error handling defects
C. Incomplete Requirements
D. Code documentation defects
Answer» D. Code documentation defects
108.

Software interoperability is:

A. The ability of a software system to work on different hardware platforms.
B. The ability of a software system to work under different operating systems.
C. The ability of a software system to exchange information with other software systems and to use the exchanged information.
D. The ability to replace a software system with another software system that has similar functionality
Answer» C. The ability of a software system to exchange information with other software systems and to use the exchanged information.
109.

White Box Techniques are also called as :-

A. Structural Testing
B. Design Based Testing
C. Error Guessing Technique
D. Experience Based Technique
Answer» B. Design Based Testing
110.

Test should be conducted for every possible _______.

A. dat(a)
B. Case.
C. Variable.
D. All the above.
Answer» E.
111.

What kind of quality cost is incurred when an error is detected in a product prior to Shipment ?

A. Prevention
B. Internal Failure
C. External Failure
D. Appraisal
Answer» C. External Failure
112.

Product quality is defined as:

A. Delivering a product with correct requirements
B. Delivering a product using correct development procedures
C. Delivering a product which is developed iteratively
D. Delivering a product using high quality procedures
Answer» E.
113.

What kind of quality cost is incurred when an error is detected in a product prior to shipment?

A. Prevention
B. Internal Failure
C. External Failure
D. Appraisal
Answer» C. External Failure
114.

Variation control in the context of software engineering involves controlling variation in the

A. Process applied
B. Resources expended
C. Product quality attributes
D. All of the above
Answer» E.
115.

Which is Black-Box Testing method?

A. Equivalence partitioning
B. Code coverage
C. Fault injection
D. none
Answer» B. Code coverage
116.

When software configuration management is a formal activity, the software configuration audit is conducted by the

A. Development team
B. Quality assurance group
C. Senior managers
D. Testing specialists
Answer» C. Senior managers
117.

Which of the following is not considered one of the four important elements that should exist when a configuration management system is developed?

A. Component elements
B. Human elements
C. Process elements
D. Validation elements
Answer» E.
118.

Which of the following is not one of the major categories of costs associated with quality?

A. Prevention costs
B. Appraisal costs
C. Internal failures
D. None of the above, they are all major categories of costs associated with quality
Answer» E.
119.

At the end of a formal technical review all attendees can decide to

A. Accept the work product without modification
B. Modify the work product and continue the review
C. Reject the product due to severe errors
D. Both (a) and (c)
Answer» E.
120.

What are the Types of Integration Testing?

A. Big Bang Testing
B. Bottom up Testing
C. Top Down Testing
D. All the above
Answer» E.
121.

__________ relates to the effort needed to the make changes to the software.

A. Functionality.
B. Maintainability.
C. Reliability.
D. Efficiency.
Answer» C. Reliability.
122.

ISO 9000 is a series of standards for quality management system and has:

A. 2 related standards
B. 5 related standards
C. 10 related standards
D. 25 related standards
Answer» C. 10 related standards
123.

The name of the testing which is done to make sure the existing features are not affected by new changes

A. Recursive testing
B. White box testing
C. Unit testing
D. Regression testing
Answer» C. Unit testing
124.

It is a set of levels that defines a testing maturity hierarchy

A. TIM (Testing Improving Model)
B. TMM (Testing Maturity Model)
C. TQM (Total Quality Management)
D. none
Answer» C. TQM (Total Quality Management)
125.

Quality costs may be divided into costs associated with

A. Prevention, appraisal and failure
B. People, process and product
C. Customers, developers and maintenance
D. All of the above
Answer» B. People, process and product
126.

Cost of quality is

A. Prevention costs
B. Appraisal costs
C. Failure costs
D. All of the above
Answer» E.
127.

Which one is not the verification activity?

A. Reviews
B. Path testing
C. Walkthroughs
D. Acceptance testing
Answer» E.
128.

Which of the following is NOT a main reason to undertake software quality assurance activities?

A. Reduce software personnel turnover
B. Legal liability
C. Insistence by the user on a satisfactory software quality assurance programme
D. Marketing reasons
Answer» D. Marketing reasons
129.

Which of the following is true regarding control charts?

A. Values above the upper and lower control limits indicate points out of adjustment.
B. Control charts are built so that new data can be quickly compared to past performance data
C. Control charts graphically present data
D. All of the above are true
Answer» E.
130.

A useful tool to visualize, clarify, link, identify, and classify possible cause of a problem. This is also called as “fishbone diagram” what is this?

A. Pareto Analysis
B. Cause-and-Effect Diagram
C. all
D. none
Answer» C. all
131.

It measures the quality of a productIt is a specific part of the QA procedure; it is a corrective process, It applies for particular product & Deals with the product.

A. Validation
B. Verification
C. Quality Assurance
D. Quality Control
Answer» E.
132.

Informing to the developer which bug to be fix first is called as

A. Severity
B. Priority
C. Fix ability
D. Traceability
Answer» C. Fix ability
133.

_________describes how the skills and experience of the project team members will bedeveloped.

A. Staff development plan
B. Staff removal plan
C. Quality management plan
D. Quality assurance Plan
Answer» B. Staff removal plan
134.

SCM is done to

A. Identify elements of software configuration
B. Control changes made on SCIs
C. Ensure that changes have been properly made
D. All of the above
Answer» E.
135.

To check whether we are developing the right product according to the customerrequirements are not. It is a static process

A. Validation
B. Verification
C. Quality Assurance
D. Quality Control
Answer» C. Quality Assurance
136.

Which type of risk factor is most likely to cause problems for a software projectdeveloping commercial software?

A. Inadequate user documentation
B. Litigation expense
C. Low productivity
D. Cancellation of project
Answer» B. Litigation expense
137.

Cyclomatic complexity is denoted by

A. V(G)=e-n+2p
B. V(G)=π+1
C. V(G)=number of regions of the graph
D. all of the above
Answer» E.
138.

Test suite is

A. Set of test cases
B. Set of inputs
C. Set of outputs
D. None of the above
Answer» B. Set of inputs
139.

The approach/document used to make sure all the requirements are covered when writing test cases

A. Test Matrix
B. Checklist
C. Test bed
D. Traceability Matrix
Answer» E.
140.

Tansient disturbance is produced in a circuit whenever

A. it is suddenly connected or discon nected from the supply
B. it is shorted
C. its applied voltage is changed suddenly
D. all of the above
Answer» E.
141.

The rms value of the complex voltage given by v = 161i sin cot + 12 Ari sin Rot is

A. 20 Ari
B. 20
C. 28
D. 192
Answer» C. 28
142.

In a load comprising of resistance and inductance:

A. Load current lags voltage
B. Load voltage lags current
C. Both are in phase
D. Any of above
Answer» B. Load voltage lags current
143.

The in-rush current of a transformer at no load is maximum if the supply voltage isswitched on

A. At zero voltage value
B. At peak voltage value
C. At V/2 value
D. At ,6 /2V value
Answer» B. At peak voltage value
144.

Which among the following methods is used for improving the system stability?

A. Increasing the system voltage
B. Reducing the transfer reactance
C. Using high speed circuit breaker
D. All of these
Answer» E.
145.

What is steady state stability limit?

A. The maximum flow of power through a particular point in the power system without loss of stability when small disturbances occur.
B. The maximum power flow possible through a particular component connected in the power system.
C. The maximum flow of power through a particular point in the power system without loss of stability when sudden disturbances occur
D. All of these
Answer» B. The maximum power flow possible through a particular component connected in the power system.
146.

The stability of the power system is not affected by which among these?

A. Generator reactance
B. Line losses
C. Excitation of generators
D. All of these
Answer» C. Excitation of generators
147.

Transient current in an R-L-C circuit is oscillatory when

A. R =0
B. R> 2f-17
C. R <2
D. R =2
Answer» D. R =2
148.

Non-sinusoidal waveforms are made of

A. different sinusoidal waveforms
B. fundamental and even harmonics
C. fundamental and odd harmonics
D. even and odd harmonics only
Answer» B. fundamental and even harmonics
149.

Single Phase Tripping is generally used in _________________.

A. Transmission System
B. Distribution System
C. Low Voltage System
D. Generation System
Answer» B. Distribution System
150.

The transients which are produced due to sudden but energetic changes from onesteady state of a circuit to another are called transients.

A. initiation
B. transition
C. relaxation
D. subsidence
Answer» C. relaxation