1. |
The probability that a software application is operating according to requirements at a given point in time. |
A. | Software Reliability |
B. | Software Quality |
C. | Software availability |
D. | Software Safety |
Answer» D. Software Safety | |
2. |
___________ Conducted at customers’ site. |
A. | Alpha Testing |
B. | Beta Testing |
C. | Unit testing |
D. | System testing |
Answer» C. Unit testing | |
3. |
_____________ Conducted at developer’s site. |
A. | Alpha Testing |
B. | Beta Testing |
C. | Unit testing |
D. | System testing |
Answer» B. Beta Testing | |
4. |
The_probability_that_a_software_application_is_operating_according_to_requirements_at_a_given_point_in_time.$ |
A. | Software Reliability |
B. | Software Quality |
C. | Software availability |
D. | Software Safety |
Answer» D. Software Safety | |
5. |
___________ Conducted at customers’ site?# |
A. | Alpha Testing |
B. | Beta Testing |
C. | Unit testing |
D. | System testing |
Answer» C. Unit testing | |
6. |
_____________ Conducted at developer’s site.$ |
A. | Alpha Testing |
B. | Beta Testing |
C. | Unit testing |
D. | System testing |
Answer» B. Beta Testing | |
7. |
Incorporating changes in an existing system to enhance, update, or upgrade its features. |
A. | Maintenance |
B. | Evaluation |
C. | Deployment |
D. | Validation |
Answer» B. Evaluation | |
8. |
A point not considered in system evaluation. |
A. | Process control |
B. | Performance evaluation |
C. | User Satisfaction |
D. | Failure Rate |
Answer» B. Performance evaluation | |
9. |
Process of evaluating a system to verify whether or not it is meeting its objectives. |
A. | System Maintenance |
B. | System Evaluation |
C. | System validation |
D. | System authorization |
Answer» C. System validation | |
10. |
Testing is conducted by the developers in testing phase. |
A. | True |
B. | False |
Answer» C. | |
11. |
______________ is done in the development phase by the developers. |
A. | Deployment |
B. | Debugging |
C. | Verification |
D. | Validation |
Answer» C. Verification | |