

MCQOPTIONS
Saved Bookmarks
This section includes 5 Mcqs, each offering curated multiple-choice questions to sharpen your Statistical Quality Control knowledge and support exam preparation. Choose a topic below to get started.
1. |
p-charts can be used rather than using the & R charts, in the case of variable time spans of data collection. |
A. | True |
B. | False |
Answer» C. | |
2. |
If the Cpl of a safety-related parameter, is 0.69, what can we say about the process capability? |
A. | Process is capable |
B. | Process is not capable |
C. | Process is capable but will become not-capable in sooner time |
D. | Process is not-capable but will become capable in sooner time |
Answer» C. Process is capable but will become not-capable in sooner time | |
3. |
Which control charts will be useful if the process output data for the process capability study are collected in different time periods? |
A. | & R Charts |
B. | p-charts |
C. | c-charts |
D. | u-charts |
Answer» B. p-charts | |
4. |
Which one of these is similar to the long-term variability? |
A. | Instantaneous variability |
B. | Variability across time |
C. | Large variability |
D. | Large distance variability |
Answer» C. Large variability | |
5. |
Which one of these charts doesn t need the specification of the quality characteristic? |
A. | & R Charts |
B. | p-charts |
C. | c-charts |
D. | u-charts |
Answer» B. p-charts | |