1. |
Reperforating will help to increase the production of the well if the perforations are plugged. |
A. | True |
B. | False |
Answer» B. False | |
2. |
For reservoir with appreciable loss of reservoir pressure, which of the following may increase the production of the well? |
A. | Logging |
B. | Slickline |
C. | Artificial lift |
D. | Well Testing |
Answer» D. Well Testing | |
3. |
Which of the following may be used to differentiate between the low permeability and formation damage? |
A. | Low GOR in oil well |
B. | Flow meter survey |
C. | Crossover sub |
D. | Slickline |
Answer» C. Crossover sub | |
4. |
Which of the following may not be the cause of the Low Production rate? |
A. | Low Permeability |
B. | Low reservoir Pressure |
C. | Formation damage |
D. | Low GOR in oil well |
Answer» E. | |
5. |
A well is having limited production rate. It may be called as a Problem Well. |
A. | True |
B. | False |
Answer» B. False | |
6. |
Which of the following need not to be done as remedial measures for the sick well? |
A. | Workover Job |
B. | Pressure maintenance |
C. | EOR |
D. | Sand production |
Answer» E. | |
7. |
Which of the following doesn t lie in the domain of the problem well? |
A. | High GOR |
B. | High Water-cut over the economic limit |
C. | High Oil production under the economic limit |
D. | Mechanical Stuck |
Answer» D. Mechanical Stuck | |