Explore topic-wise MCQs in Petroleum Production Operations.

This section includes 5 Mcqs, each offering curated multiple-choice questions to sharpen your Petroleum Production Operations knowledge and support exam preparation. Choose a topic below to get started.

1.

If the correlation coefficient is less than 1 then it indicates then the data obtained from the flow meter is of _____

A. Bad Quality
B. Doesn’t depend on the correlation coefficient
C. Good quality
D. Medium Quality
Answer» D. Medium Quality
2.

When the well is put in a shut-in condition, then the pressure starts to ____

A. Build up
B. Build down
C. Decreases
D. Become zero
Answer» B. Build down
3.

The beginning of water production coinciding along with reduction in production of oil is a perfect sign of scale problems in a well.

A. True
B. False
Answer» B. False
4.

Which of the following log is used to identify the Barium Sulfate scale?

A. Resistivity log
B. Gamma-ray log
C. Neutron log
D. Density log
Answer» C. Neutron log
5.

The easiest method of physically detecting any type of scale in the wellbore is to run the caliper down the wellbore.

A. True
B. False
Answer» B. False