MCQOPTIONS
Saved Bookmarks
This section includes 5 Mcqs, each offering curated multiple-choice questions to sharpen your Petroleum Production Operations knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
If the correlation coefficient is less than 1 then it indicates then the data obtained from the flow meter is of _____ |
| A. | Bad Quality |
| B. | Doesn’t depend on the correlation coefficient |
| C. | Good quality |
| D. | Medium Quality |
| Answer» D. Medium Quality | |
| 2. |
When the well is put in a shut-in condition, then the pressure starts to ____ |
| A. | Build up |
| B. | Build down |
| C. | Decreases |
| D. | Become zero |
| Answer» B. Build down | |
| 3. |
The beginning of water production coinciding along with reduction in production of oil is a perfect sign of scale problems in a well. |
| A. | True |
| B. | False |
| Answer» B. False | |
| 4. |
Which of the following log is used to identify the Barium Sulfate scale? |
| A. | Resistivity log |
| B. | Gamma-ray log |
| C. | Neutron log |
| D. | Density log |
| Answer» C. Neutron log | |
| 5. |
The easiest method of physically detecting any type of scale in the wellbore is to run the caliper down the wellbore. |
| A. | True |
| B. | False |
| Answer» B. False | |