MCQOPTIONS
Saved Bookmarks
This section includes 5 Mcqs, each offering curated multiple-choice questions to sharpen your Petroleum Production Operations knowledge and support exam preparation. Choose a topic below to get started.
1. |
Squeeze cementing is a dehydration process. |
A. | True |
B. | False |
Answer» B. False | |
2. |
How far is the cement brought up the annulus? |
A. | To the surface |
B. | Min 200-500 ft above the shoe |
C. | Quarter Way up the wellbore |
D. | Min 1200-1500 ft above the shoe |
Answer» C. Quarter Way up the wellbore | |
3. |
When are the drillable packers used? |
A. | Resetting permits flexibility and to find casing leak |
B. | Low-pressure application |
C. | High-pressure application |
D. | To abandon the lower perforation to abandon the lower perforation |
Answer» E. | |
4. |
In the petroleum industry, Coiled Tubing is faster or slower than a workover rig? |
A. | Slower |
B. | Same |
C. | Faster |
D. | Can t say |
Answer» D. Can t say | |
5. |
When using coil tubing, what is the name of the unit used to push/pull? |
A. | Injector |
B. | Mud pump |
C. | Charge pump |
D. | Top drive |
Answer» B. Mud pump | |