| 1. |
Squeeze cementing is a dehydration process. |
| A. | True |
| B. | False |
| Answer» B. False | |
| 2. |
How far is the cement brought up the annulus? |
| A. | To the surface |
| B. | Min 200-500 ft above the shoe |
| C. | Quarter Way up the wellbore |
| D. | Min 1200-1500 ft above the shoe |
| Answer» C. Quarter Way up the wellbore | |
| 3. |
When are the drillable packers used? |
| A. | Resetting permits flexibility and to find casing leak |
| B. | Low-pressure application |
| C. | High-pressure application |
| D. | To abandon the lower perforation to abandon the lower perforation |
| Answer» E. | |
| 4. |
In the petroleum industry, Coiled Tubing is faster or slower than a workover rig? |
| A. | Slower |
| B. | Same |
| C. | Faster |
| D. | Can t say |
| Answer» D. Can t say | |
| 5. |
When using coil tubing, what is the name of the unit used to push/pull? |
| A. | Injector |
| B. | Mud pump |
| C. | Charge pump |
| D. | Top drive |
| Answer» B. Mud pump | |