1. |
The difference between the maximum time available and the actual time needed to perform an activity is known as _________ |
A. | Free float |
B. | Independent float |
C. | Total float |
D. | Half float |
Answer» D. Half float | |
2. |
In a network, a critical path is the time-wise shortest path. |
A. | True |
B. | False |
Answer» C. | |
3. |
According to the time estimates made by the PERT planners, the maximum time that would be needed to complete an activity is called as __________ |
A. | The most likely time estimate |
B. | Optimistic time estimate |
C. | Pessimistic time estimate |
D. | Expected time estimate |
Answer» D. Expected time estimate | |
4. |
The shortest possible time in which an activity can be achieved under ideal circumstances is known as ________ |
A. | Pessimistic time estimate |
B. | Optimistic time estimate |
C. | Expected time estimate |
D. | The most likely time estimate |
Answer» C. Expected time estimate | |
5. |
_________ are used to represent activity in a network diagram. |
A. | Circles |
B. | Squares |
C. | Rectangles |
D. | Arrows |
Answer» E. | |
6. |
The full form of CPM is ___________ |
A. | Critical Path Method |
B. | Control Path Method |
C. | Critical Plan Management |
D. | Control Path Management |
Answer» B. Control Path Method | |
7. |
The full form of PERT is ___________ |
A. | Program Evaluation and Rate Technology |
B. | Program Evaluation and Robot Technique |
C. | Program Evaluation and Robot Technology |
D. | Program Evaluation and Review Technique |
Answer» E. | |