1. |
Which of these is not a part of tollgate review after Improve step? |
A. | Adequate documentation of how the solution was obtained |
B. | Documentation on alternative solutions that were considered |
C. | Complete results of pilot tests |
D. | Results of FMEA |
Answer» E. | |
2. |
Which one of these is not a part of the 3 criteria for FMEA? |
A. | Likelihood of a process going wrong |
B. | Ability of detecting a failure |
C. | Cause for a failure |
D. | The severity of a failure |
Answer» D. The severity of a failure | |
3. |
The 3 criterion for FMEA are scored on _____ scale. |
A. | 0 to 1 |
B. | 0 to 100 |
C. | 0 to 10 |
D. | 0 to 5 |
Answer» D. 0 to 5 | |
4. |
In FMEA, M stands for _____ |
A. | Modes |
B. | Measurement |
C. | Manufacture |
D. | Material |
Answer» B. Measurement | |
5. |
The data collected in measure step may have a reference from the historical records. Which of these options is correct bearing the above statement in mind? |
A. | Data from the historical records is satisfactory |
B. | Data from the historical records may not always be satisfactory |
C. | Data must always be collected only from historical records |
D. | Historical records are most reliable for data collection |
Answer» C. Data must always be collected only from historical records | |
6. |
Which of these is not necessary in a tollgate report after measure step of DMAIC? |
A. | A list of identified KPIV s and KPOV s |
B. | Measurement system capability |
C. | SIPOC diagram |
D. | Assumptions made during the data collection |
Answer» D. Assumptions made during the data collection | |
7. |
KPIV s and KPOV s are measured in _______ |
A. | Define step |
B. | Measure step |
C. | In both Define and Measure step |
D. | Improve step |
Answer» D. Improve step | |
8. |
Input is defined as _____ |
A. | Material provided to a process |
B. | Changes made to controllable variables |
C. | Development of in the process |
D. | Desired product specification |
Answer» B. Changes made to controllable variables | |