This section includes 4 Mcqs, each offering curated multiple-choice questions to sharpen your Civil Engineering Drawing knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
Which is not the essential quality of a good surveyor? |
| A. | The quality surveyor must be well versed with the drawings of work |
| B. | He should be able to read the drawing correctly and bill the quantities accurately |
| C. | He should have a thorough knowledge of the construction procedure to be adopted, the various items of works involved in the execution and the different materials to be used in the work |
| D. | Oral representation of schedule to be priced by tenderor |
| Answer» E. | |
| 2. |
The estimate which prepared using any rough method to get the approximate cost construction anticipated in a project is called an ______________ estimate. |
| A. | approximate |
| B. | precise |
| C. | exact |
| D. | rough |
| Answer» B. precise | |
| 3. |
For cost estimating _________ serves as an important framework for organized collection project cost data and preparing the cost estimates at different levels. |
| A. | WCS |
| B. | WPS |
| C. | WMS |
| D. | WBS |
| Answer» E. | |
| 4. |
A ______________ may be included in an estimate to provide for unknown costs which are indicated as likely to occur by experience, but are not identifiable. |
| A. | approximate |
| B. | improbability |
| C. | contingency |
| D. | certainty |
| Answer» D. certainty | |