Explore topic-wise MCQs in Petroleum Production Operations.

This section includes 5 Mcqs, each offering curated multiple-choice questions to sharpen your Petroleum Production Operations knowledge and support exam preparation. Choose a topic below to get started.

1.

Which of the following choke is installed on the production tree flow wing to regulate flow from the well?

A. Circulating
B. Failsafe
C. HCR
D. Production
Answer» C. HCR
2.

When do the swabbing while pulling can take place significantly?

A. When pulling Packer
B. When pulling Lifting sub
C. When pulling Tubing
D. When pulling SCSSVS valve
Answer» B. When pulling Lifting sub
3.

What is the name of the tool that can be run to find a hole in the tubing?

A. Hole search
B. Float valve
C. Ponytail
D. Free point
Answer» D. Free point
4.

What is the name of the equipment used in the testing of a Christmas tree in the oil and gas industry?

A. Crown valve
B. SSV
C. Back pressure valve
D. Two-way valve
Answer» E.
5.

The Cement Retainer is a non-drillable packer.

A. True
B. False
Answer» C.