1. |
Which of the following choke is installed on the production tree flow wing to regulate flow from the well? |
A. | Circulating |
B. | Failsafe |
C. | HCR |
D. | Production |
Answer» C. HCR | |
2. |
When do the swabbing while pulling can take place significantly? |
A. | When pulling Packer |
B. | When pulling Lifting sub |
C. | When pulling Tubing |
D. | When pulling SCSSVS valve |
Answer» B. When pulling Lifting sub | |
3. |
What is the name of the tool that can be run to find a hole in the tubing? |
A. | Hole search |
B. | Float valve |
C. | Ponytail |
D. | Free point |
Answer» D. Free point | |
4. |
What is the name of the equipment used in the testing of a Christmas tree in the oil and gas industry? |
A. | Crown valve |
B. | SSV |
C. | Back pressure valve |
D. | Two-way valve |
Answer» E. | |
5. |
The Cement Retainer is a non-drillable packer. |
A. | True |
B. | False |
Answer» C. | |