MCQOPTIONS
Saved Bookmarks
This section includes 5 Mcqs, each offering curated multiple-choice questions to sharpen your Petroleum Production Operations knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
Which of the following choke is installed on the production tree flow wing to regulate flow from the well? |
| A. | Circulating |
| B. | Failsafe |
| C. | HCR |
| D. | Production |
| Answer» C. HCR | |
| 2. |
When do the swabbing while pulling can take place significantly? |
| A. | When pulling Packer |
| B. | When pulling Lifting sub |
| C. | When pulling Tubing |
| D. | When pulling SCSSVS valve |
| Answer» B. When pulling Lifting sub | |
| 3. |
What is the name of the tool that can be run to find a hole in the tubing? |
| A. | Hole search |
| B. | Float valve |
| C. | Ponytail |
| D. | Free point |
| Answer» D. Free point | |
| 4. |
What is the name of the equipment used in the testing of a Christmas tree in the oil and gas industry? |
| A. | Crown valve |
| B. | SSV |
| C. | Back pressure valve |
| D. | Two-way valve |
| Answer» E. | |
| 5. |
The Cement Retainer is a non-drillable packer. |
| A. | True |
| B. | False |
| Answer» C. | |