| 1. |
Which among the following is a step taken by the Indian railways to ensure smooth flow of traffic? |
| A. | Converting all the metre gauge lines to broad gauge lines |
| B. | Converting all the metre gauge lines to narrow gauge lines |
| C. | Increasing the width of sleepers in track |
| D. | Using concrete for construction of sleepers |
| Answer» B. Converting all the metre gauge lines to narrow gauge lines | |
| 2. |
What can be done to manage the increase in traffic between two points? |
| A. | Increase the number of sleepers |
| B. | Changing the depth of ballast cushion |
| C. | Converting the single rail lines to double |
| D. | Changing the material of the rails |
| Answer» D. Changing the material of the rails | |
| 3. |
How can we shorten the existing rail link between two points? |
| A. | Construction of new railway line on shorter alignment |
| B. | Increasing the gauge size |
| C. | Increasing the capacity of locomotive |
| D. | It isn t possible |
| Answer» B. Increasing the gauge size | |
| 4. |
The rate of development of backward areas decrease after the construction of a new railway line. |
| A. | True |
| B. | False |
| Answer» C. | |
| 5. |
What is the most important strategic reason for the construction of a new railway line? |
| A. | To increase tourists |
| B. | To make movement of defence forces easier in case of emergency |
| C. | For creating jobs |
| D. | Because of absence of a railway line |
| Answer» C. For creating jobs | |