1.

The process to gather the software requirements from client, analyze and document them is known as ___________________.

A. Feasibility Study
B. Requirement Gathering
C. Requirement Engineering
D. System Requirements Specification
Answer» D. System Requirements Specification
2.

During what phase, the requirements analysis is performed?

A. system design phase
B. system analysis phase
C. system investigation phase
D. system development phase
Answer» C. system investigation phase
3.

It is the process in which developers discuss with the client and end users and know their expectations from the software.

A. Requirements gathering
B. Organizing Requirements
C. Negotiation & discussion
D. Documentation
Answer» B. Organizing Requirements
4.

The process together the software requirements from Client, Analyze and Document is known as ______ .

A. Requirement engineering process
B. Requirement elicitation process
C. User interface requirements
D. Software system analyst
Answer» B. Requirement elicitation process
5.

Which of the following statements about SRS is/are true ?i. SRS is written by customerii. SRS is written by a developeriii. SRS serves as a contract between customer and developer

A. Only i is true
B. Both ii and iii are true
C. All are true
D. None is true
Answer» D. None is true
6.

The system specification describes the

A. Function, performance and constraints of a computer-based system
B. implementation of each allocated system
C. element software architecture
D. time required for system simulation
Answer» B. implementation of each allocated system
7.

Which is not a step of Requirement Engineering?

A. Requirements elicitation
B. Requirements analysis
C. Requirements design
D. Requirements documentation
Answer» D. Requirements documentation
8.

During project inception the intent of the of the tasks are to determine

A. basic problem understanding
B. nature of the solution needed
C. people who want a solution
D. All of the above
Answer» E.
9.

Three things that make requirements elicitation difficult are problems of

A. scope
B. understanding
C. volatility
D. All of the above
Answer» E.
10.

A management steering committee is an example of

A. five dimensions of IRM
B. management involvement
C. information systems performance
D. infromation resource management
Answer» C. information systems performance
11.

Distribution of source code for system application so that customers can make local modifications is referred to as

A. open source
B. net source
C. ubiquitous computing
D. in source
Answer» B. net source
12.

Abbreviate the term SRS.

A. Software Requirement Specification
B. Software Refining Solution
C. Software Resource Source
D. None of the above
Answer» B. Software Refining Solution
13.

The best way to conduct a requirements validation review is to

A. examine the system model for errors
B. have the customer look over the requirements
C. send them to the design team and see if they have any concerns
D. use a checklist of questions to examine each requirement
Answer» E.
14.

Which of the following is correct software metrics?

A. Complexity Metrics
B. Quality Metrics
C. Process Metrics
D. All of the above
Answer» E.
15.

The result of the requirements engineering elaboration task is an analysis model that defines which of the following problem domain(s)?

A. information
B. functional
C. behavioral
D. all of the above
Answer» E.
16.

Which diagram of UML represent Interaction modeling?

A. Use Case
B. Sequence
C. State Chart
D. both a and b
Answer» E.
17.

Which of the following is not one of the context-free questions that would be used during project inception?

A. What will be the economic benefit from a good solution?
B. Who is against this project?
C. Who will pay for the work?
D. Who will use the solution?
Answer» C. Who will pay for the work?
18.

Which of the following model in system modelling depicts the static nature of the system ?

A. Structural Model
B. External Model
C. Behavioral Model
D. Data Model
Answer» B. External Model
19.

Outsourcing applications that run on Web is referred to as

A. ubiquitous learning
B. net sourcing
C. ubiquitous computing
D. open source
Answer» C. ubiquitous computing
20.

Which of the following is/are Project Estimation Technique?

A. Empirical Estimation Technique.
B. Heuristic Estimation Technique.
C. Analytical Estimation Technique.
D. All of the above.
Answer» E.
21.

Challenge for software engineers to develop systems and application software that allows small devices, personal computers and enterprise system to communicate across vast network is referred to as

A. ubiquitous learning
B. ubiquitous computing
C. information technology
D. ubiquitous commerce
Answer» C. information technology
22.

Which is one of the most important stakeholder from the following ?

A. Entry level personnel
B. Middle level stakeholder
C. Managers
D. Users of the software
Answer» E.
23.

Select the developer specific requirement ?

A. Potability
B. Maintainability
C. Availability
D. Both a and b
Answer» E.
24.

Arrange the tasks involved in requirements elicitation in an appropriate manner.i. Consolidationii. Prioritizationiii. Requirements Gatheringiv. Evaluation

A. iii, i, ii, iv
B. iii, iv, ii, i
C. iii, ii, iv, i
D. ii, iii, iv, i
Answer» C. iii, ii, iv, i
25.

What are the types of software development requirements ?

A. Availability
B. Reliability
C. Usability
D. All of the mentioned
Answer» E.
26.

Starting from least to most important, choose the order of stakeholder.i. Managersii. Entry level Personneliii. Usersiv. Middle level stakeholder

A. i, ii, iv, iii
B. i, ii, iii, iv
C. ii, iv, i, iii
D. None of the above
Answer» D. None of the above
27.

What is the major drawback of CORE(Controlled Requirements Expression) ?

A. Requirements are comprehensive
B. NFRs are not given enough importance
C. Role of analyst is passive
D. None of the above
Answer» D. None of the above
28.

How many classification schemes have been developed for NFRs(Non-Functional Requirement) ?

A. Two
B. Three
C. Four
D. Five
Answer» E.
29.

Arrange the steps in order to represent the conducting of Wideband Delphi Technique.i. Conduct a group discussionii. Conduct another group discussioniii. Present experts with a problemiv. Collect expert opinion anonymouslyv. Iterate until consensus is reachedvi. Feedback a summary of result to each expert

A. i, iii, ii, iv, v, vi
B. iii, i, ii, iv, v, vi
C. i, ii, iii, iv, vi, v
D. iii, i, iv, vi, ii, v
Answer» E.
30.

How many Scenarios are there in elicitation activities ?

A. One
B. Two
C. Three
D. Four
Answer» E.
31.

The use of traceability tables helps to

A. debug programs following the detection of run-time errors
B. determine the performance of algorithm implementations
C. identify, control, and track requirements changes
D. none of the above
Answer» D. none of the above
32.

Consider the following Statement: “The output of a program shall be given within 10secs of event X 10% of the time.”What characteristic of SRS is being depicted here ?

A. Consistent
B. Verifiable
C. Non-verifiable
D. Correct
Answer» C. Non-verifiable
33.

Which of the following is not one of the requirement classifications used in Quality Function Deployment (QFD)?

A. exciting
B. expected
C. mandatory
D. normal
Answer» D. normal
34.

Which tools are helpful in all the stages of SDLC, for requirement gathering to testing and documentation?

A. Upper case tools
B. Lower case tools
C. Integrated case tools
D. None of the above
Answer» D. None of the above
35.

Which of these primary objectives have to be achieved for the requirement model?

A. To describe what the customer requires
B. To establish a basis for the creation of a software design
C. To define a set of requirements that can be validated once the software
D. All mentioned above
Answer» E.
36.

Size Metrics denoted by?

A. LOC
B. KLOC
C. GLOC
D. ZLOC
Answer» C. GLOC
37.

Arrange the given sequence to form a SRS Prototype outline as per IEEE SRS Standard.i. General descriptionii. Introductioniii. Indexiv. Appendicesv. Specific Requirements

A. iii, i, ii,v, iv
B. iii, ii, i, v, iv
C. ii, i, v, iv, iii
D. None of the above
Answer» D. None of the above
38.

Who are supervisory user

A. They are clients
B. They are the normal users
C. They are employed in a supervisor capacity level usually to manage a group of operational users
D. None of the above
Answer» D. None of the above
39.

Delta requirement stands for

A. The delta version of a system
B. The SRS document prepared in delta from
C. Where specification of desired changes is sent to earlier version of a system
D. None of the above
Answer» D. None of the above
40.

The work products produced during requirement elicitation will vary depending on the

A. size of the budget
B. size of the product being built
C. software process being used
D. stakeholders needs
Answer» C. software process being used
41.

During the system study, flowcharts are drawn using

A. general symbols
B. specific symbols
C. abbreviated symbols
D. non-standard symbols
Answer» B. specific symbols
42.

Which of the following is not a diagram studied in Requirement Analysis ?

A. Use Cases
B. Entity Relationship Diagram
C. State Transition Diagram
D. Activity Diagram
Answer» E.
43.

What is the meaning of requirement elicitation in software engineering?

A. Gathering of requirement.
B. Understanding of requirement.
C. Getting the requirements from client.
D. All of the above.
Answer» E.
44.

The goal of requirement engineering is to develop and maintain sophisticated and descriptive _________________ document.

A. Feasibility Study
B. Requirement Gathering
C. Software Requirement Validation
D. System Requirements Specification
Answer» E.
45.

The interviews, which are held between two persons across the table is ______.

A. Written
B. Non-structured
C. Group
D. One-to-one
Answer» E.
46.

Which of the following perspective in system modelling shows the system or data architecture?

A. Data perspective
B. External perspective
C. Behavioral perspective
D. Structural perspective
Answer» E.
47.

The initiation of a systems investigation may result from

A. an analysis investigation
B. scheduled systems review
C. a manager's formal request
D. all of these
Answer» E.
48.

Which of the following model in system modelling depicts the dynamic behaviour of the system?

A. Behavioral Model
B. Context Model
C. Structural Model
D. Object Model
Answer» B. Context Model
49.

In collaborative requirements gathering, the facilitator

A. cannot be a member of the software team
B. cannot be a customer
C. controls and facilitates the process
D. must be an outsider
Answer» D. must be an outsider
50.

Which of the following elicitation techniques is a view-point based method ?

A. FODA
B. QFD
C. CORE
D. IBIS
Answer» D. IBIS