This section includes 65 Mcqs, each offering curated multiple-choice questions to sharpen your Matlab knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
The process to gather the software requirements from client, analyze and document them is known as ___________________. |
| A. | Feasibility Study |
| B. | Requirement Gathering |
| C. | Requirement Engineering |
| D. | System Requirements Specification |
| Answer» D. System Requirements Specification | |
| 2. |
During what phase, the requirements analysis is performed? |
| A. | system design phase |
| B. | system analysis phase |
| C. | system investigation phase |
| D. | system development phase |
| Answer» C. system investigation phase | |
| 3. |
It is the process in which developers discuss with the client and end users and know their expectations from the software. |
| A. | Requirements gathering |
| B. | Organizing Requirements |
| C. | Negotiation & discussion |
| D. | Documentation |
| Answer» B. Organizing Requirements | |
| 4. |
The process together the software requirements from Client, Analyze and Document is known as ______ . |
| A. | Requirement engineering process |
| B. | Requirement elicitation process |
| C. | User interface requirements |
| D. | Software system analyst |
| Answer» B. Requirement elicitation process | |
| 5. |
Which of the following statements about SRS is/are true ?i. SRS is written by customerii. SRS is written by a developeriii. SRS serves as a contract between customer and developer |
| A. | Only i is true |
| B. | Both ii and iii are true |
| C. | All are true |
| D. | None is true |
| Answer» D. None is true | |
| 6. |
The system specification describes the |
| A. | Function, performance and constraints of a computer-based system |
| B. | implementation of each allocated system |
| C. | element software architecture |
| D. | time required for system simulation |
| Answer» B. implementation of each allocated system | |
| 7. |
Which is not a step of Requirement Engineering? |
| A. | Requirements elicitation |
| B. | Requirements analysis |
| C. | Requirements design |
| D. | Requirements documentation |
| Answer» D. Requirements documentation | |
| 8. |
During project inception the intent of the of the tasks are to determine |
| A. | basic problem understanding |
| B. | nature of the solution needed |
| C. | people who want a solution |
| D. | All of the above |
| Answer» E. | |
| 9. |
Three things that make requirements elicitation difficult are problems of |
| A. | scope |
| B. | understanding |
| C. | volatility |
| D. | All of the above |
| Answer» E. | |
| 10. |
A management steering committee is an example of |
| A. | five dimensions of IRM |
| B. | management involvement |
| C. | information systems performance |
| D. | infromation resource management |
| Answer» C. information systems performance | |
| 11. |
Distribution of source code for system application so that customers can make local modifications is referred to as |
| A. | open source |
| B. | net source |
| C. | ubiquitous computing |
| D. | in source |
| Answer» B. net source | |
| 12. |
Abbreviate the term SRS. |
| A. | Software Requirement Specification |
| B. | Software Refining Solution |
| C. | Software Resource Source |
| D. | None of the above |
| Answer» B. Software Refining Solution | |
| 13. |
The best way to conduct a requirements validation review is to |
| A. | examine the system model for errors |
| B. | have the customer look over the requirements |
| C. | send them to the design team and see if they have any concerns |
| D. | use a checklist of questions to examine each requirement |
| Answer» E. | |
| 14. |
Which of the following is correct software metrics? |
| A. | Complexity Metrics |
| B. | Quality Metrics |
| C. | Process Metrics |
| D. | All of the above |
| Answer» E. | |
| 15. |
The result of the requirements engineering elaboration task is an analysis model that defines which of the following problem domain(s)? |
| A. | information |
| B. | functional |
| C. | behavioral |
| D. | all of the above |
| Answer» E. | |
| 16. |
Which diagram of UML represent Interaction modeling? |
| A. | Use Case |
| B. | Sequence |
| C. | State Chart |
| D. | both a and b |
| Answer» E. | |
| 17. |
Which of the following is not one of the context-free questions that would be used during project inception? |
| A. | What will be the economic benefit from a good solution? |
| B. | Who is against this project? |
| C. | Who will pay for the work? |
| D. | Who will use the solution? |
| Answer» C. Who will pay for the work? | |
| 18. |
Which of the following model in system modelling depicts the static nature of the system ? |
| A. | Structural Model |
| B. | External Model |
| C. | Behavioral Model |
| D. | Data Model |
| Answer» B. External Model | |
| 19. |
Outsourcing applications that run on Web is referred to as |
| A. | ubiquitous learning |
| B. | net sourcing |
| C. | ubiquitous computing |
| D. | open source |
| Answer» C. ubiquitous computing | |
| 20. |
Which of the following is/are Project Estimation Technique? |
| A. | Empirical Estimation Technique. |
| B. | Heuristic Estimation Technique. |
| C. | Analytical Estimation Technique. |
| D. | All of the above. |
| Answer» E. | |
| 21. |
Challenge for software engineers to develop systems and application software that allows small devices, personal computers and enterprise system to communicate across vast network is referred to as |
| A. | ubiquitous learning |
| B. | ubiquitous computing |
| C. | information technology |
| D. | ubiquitous commerce |
| Answer» C. information technology | |
| 22. |
Which is one of the most important stakeholder from the following ? |
| A. | Entry level personnel |
| B. | Middle level stakeholder |
| C. | Managers |
| D. | Users of the software |
| Answer» E. | |
| 23. |
Select the developer specific requirement ? |
| A. | Potability |
| B. | Maintainability |
| C. | Availability |
| D. | Both a and b |
| Answer» E. | |
| 24. |
Arrange the tasks involved in requirements elicitation in an appropriate manner.i. Consolidationii. Prioritizationiii. Requirements Gatheringiv. Evaluation |
| A. | iii, i, ii, iv |
| B. | iii, iv, ii, i |
| C. | iii, ii, iv, i |
| D. | ii, iii, iv, i |
| Answer» C. iii, ii, iv, i | |
| 25. |
What are the types of software development requirements ? |
| A. | Availability |
| B. | Reliability |
| C. | Usability |
| D. | All of the mentioned |
| Answer» E. | |
| 26. |
Starting from least to most important, choose the order of stakeholder.i. Managersii. Entry level Personneliii. Usersiv. Middle level stakeholder |
| A. | i, ii, iv, iii |
| B. | i, ii, iii, iv |
| C. | ii, iv, i, iii |
| D. | None of the above |
| Answer» D. None of the above | |
| 27. |
What is the major drawback of CORE(Controlled Requirements Expression) ? |
| A. | Requirements are comprehensive |
| B. | NFRs are not given enough importance |
| C. | Role of analyst is passive |
| D. | None of the above |
| Answer» D. None of the above | |
| 28. |
How many classification schemes have been developed for NFRs(Non-Functional Requirement) ? |
| A. | Two |
| B. | Three |
| C. | Four |
| D. | Five |
| Answer» E. | |
| 29. |
Arrange the steps in order to represent the conducting of Wideband Delphi Technique.i. Conduct a group discussionii. Conduct another group discussioniii. Present experts with a problemiv. Collect expert opinion anonymouslyv. Iterate until consensus is reachedvi. Feedback a summary of result to each expert |
| A. | i, iii, ii, iv, v, vi |
| B. | iii, i, ii, iv, v, vi |
| C. | i, ii, iii, iv, vi, v |
| D. | iii, i, iv, vi, ii, v |
| Answer» E. | |
| 30. |
How many Scenarios are there in elicitation activities ? |
| A. | One |
| B. | Two |
| C. | Three |
| D. | Four |
| Answer» E. | |
| 31. |
The use of traceability tables helps to |
| A. | debug programs following the detection of run-time errors |
| B. | determine the performance of algorithm implementations |
| C. | identify, control, and track requirements changes |
| D. | none of the above |
| Answer» D. none of the above | |
| 32. |
Consider the following Statement: “The output of a program shall be given within 10secs of event X 10% of the time.”What characteristic of SRS is being depicted here ? |
| A. | Consistent |
| B. | Verifiable |
| C. | Non-verifiable |
| D. | Correct |
| Answer» C. Non-verifiable | |
| 33. |
Which of the following is not one of the requirement classifications used in Quality Function Deployment (QFD)? |
| A. | exciting |
| B. | expected |
| C. | mandatory |
| D. | normal |
| Answer» D. normal | |
| 34. |
Which tools are helpful in all the stages of SDLC, for requirement gathering to testing and documentation? |
| A. | Upper case tools |
| B. | Lower case tools |
| C. | Integrated case tools |
| D. | None of the above |
| Answer» D. None of the above | |
| 35. |
Which of these primary objectives have to be achieved for the requirement model? |
| A. | To describe what the customer requires |
| B. | To establish a basis for the creation of a software design |
| C. | To define a set of requirements that can be validated once the software |
| D. | All mentioned above |
| Answer» E. | |
| 36. |
Size Metrics denoted by? |
| A. | LOC |
| B. | KLOC |
| C. | GLOC |
| D. | ZLOC |
| Answer» C. GLOC | |
| 37. |
Arrange the given sequence to form a SRS Prototype outline as per IEEE SRS Standard.i. General descriptionii. Introductioniii. Indexiv. Appendicesv. Specific Requirements |
| A. | iii, i, ii,v, iv |
| B. | iii, ii, i, v, iv |
| C. | ii, i, v, iv, iii |
| D. | None of the above |
| Answer» D. None of the above | |
| 38. |
Who are supervisory user |
| A. | They are clients |
| B. | They are the normal users |
| C. | They are employed in a supervisor capacity level usually to manage a group of operational users |
| D. | None of the above |
| Answer» D. None of the above | |
| 39. |
Delta requirement stands for |
| A. | The delta version of a system |
| B. | The SRS document prepared in delta from |
| C. | Where specification of desired changes is sent to earlier version of a system |
| D. | None of the above |
| Answer» D. None of the above | |
| 40. |
The work products produced during requirement elicitation will vary depending on the |
| A. | size of the budget |
| B. | size of the product being built |
| C. | software process being used |
| D. | stakeholders needs |
| Answer» C. software process being used | |
| 41. |
During the system study, flowcharts are drawn using |
| A. | general symbols |
| B. | specific symbols |
| C. | abbreviated symbols |
| D. | non-standard symbols |
| Answer» B. specific symbols | |
| 42. |
Which of the following is not a diagram studied in Requirement Analysis ? |
| A. | Use Cases |
| B. | Entity Relationship Diagram |
| C. | State Transition Diagram |
| D. | Activity Diagram |
| Answer» E. | |
| 43. |
What is the meaning of requirement elicitation in software engineering? |
| A. | Gathering of requirement. |
| B. | Understanding of requirement. |
| C. | Getting the requirements from client. |
| D. | All of the above. |
| Answer» E. | |
| 44. |
The goal of requirement engineering is to develop and maintain sophisticated and descriptive _________________ document. |
| A. | Feasibility Study |
| B. | Requirement Gathering |
| C. | Software Requirement Validation |
| D. | System Requirements Specification |
| Answer» E. | |
| 45. |
The interviews, which are held between two persons across the table is ______. |
| A. | Written |
| B. | Non-structured |
| C. | Group |
| D. | One-to-one |
| Answer» E. | |
| 46. |
Which of the following perspective in system modelling shows the system or data architecture? |
| A. | Data perspective |
| B. | External perspective |
| C. | Behavioral perspective |
| D. | Structural perspective |
| Answer» E. | |
| 47. |
The initiation of a systems investigation may result from |
| A. | an analysis investigation |
| B. | scheduled systems review |
| C. | a manager's formal request |
| D. | all of these |
| Answer» E. | |
| 48. |
Which of the following model in system modelling depicts the dynamic behaviour of the system? |
| A. | Behavioral Model |
| B. | Context Model |
| C. | Structural Model |
| D. | Object Model |
| Answer» B. Context Model | |
| 49. |
In collaborative requirements gathering, the facilitator |
| A. | cannot be a member of the software team |
| B. | cannot be a customer |
| C. | controls and facilitates the process |
| D. | must be an outsider |
| Answer» D. must be an outsider | |
| 50. |
Which of the following elicitation techniques is a view-point based method ? |
| A. | FODA |
| B. | QFD |
| C. | CORE |
| D. | IBIS |
| Answer» D. IBIS | |