

MCQOPTIONS
Saved Bookmarks
This section includes 13 Mcqs, each offering curated multiple-choice questions to sharpen your Fluid Mechanics knowledge and support exam preparation. Choose a topic below to get started.
1. |
What does FFT in vibration testing stand for? |
A. | Fast Fourier Transformation |
B. | Fast Foil Temperature |
C. | Fast Foil Transformation |
D. | Feature Fourier Transformation |
Answer» B. Fast Foil Temperature | |
2. |
A test that is performed at different flow rates is__________ |
A. | Casing inspection |
B. | Casing hydrostatic test |
C. | NPSH test |
D. | Vibration test |
Answer» E. | |
3. |
What does NPSH stand for? |
A. | Net positive suction head |
B. | Net positive super head |
C. | Net planar suction head |
D. | Non-planar suction head |
Answer» B. Net positive super head | |
4. |
What does SME stand for? |
A. | Subject mass export |
B. | Subject mass expert |
C. | Subject matter expert |
D. | Subject matter export |
Answer» D. Subject matter export | |
5. |
A_TEST_THAT_IS_PERFORMED_AT_DIFFERENT_FLOW_RATES_IS__________?$ |
A. | Casing inspection |
B. | Casing hydrostatic test |
C. | NPSH test |
D. | Vibration test |
Answer» E. | |
6. |
What does FFT in vibration testing stand for?$ |
A. | Fast Fourier Transformation |
B. | Fast Foil Temperature |
C. | Fast Foil Transformation |
D. | Feature Fourier Transformation |
Answer» B. Fast Foil Temperature | |
7. |
Which among the following is not a pump operating parameter? |
A. | Power consumption |
B. | Bearing temperature |
C. | Density |
D. | Shaft speed |
Answer» D. Shaft speed | |
8. |
How long is the pump mechanical run test performed? |
A. | 1 hour |
B. | 2 hours |
C. | 3 hours |
D. | 4 hours |
Answer» E. | |
9. |
What is the full form of SME in Model Testing Partially Submerged Bodies? |
A. | Subject mass export |
B. | Subject mass expert |
C. | Subject matter expert |
D. | Subject matter export |
Answer» D. Subject matter export | |
10. |
The pump hydrostatic test is tested at __________ |
A. | 2 times the maximum allowable work pressure |
B. | 3 times the maximum allowable work pressure |
C. | 5 times the maximum allowable work pressure |
D. | 1.5 times the maximum allowable work pressure |
Answer» E. | |
11. |
Which test is performed after the pump inspection? |
A. | Casing inspection |
B. | Casing hydrostatic test |
C. | NPSH test |
D. | Mechanical running test |
Answer» C. NPSH test | |
12. |
The performance test is completed after completion of________ |
A. | Casing inspection |
B. | Regulation |
C. | Pump enhancement |
D. | Hydrostatic check |
Answer» B. Regulation | |
13. |
What is model testing? |
A. | Performance testing |
B. | Partial testing |
C. | Function testing |
D. | Overall testing |
Answer» B. Partial testing | |