 
			 
			MCQOPTIONS
 Saved Bookmarks
				This section includes 13 Mcqs, each offering curated multiple-choice questions to sharpen your Engineering Metrology knowledge and support exam preparation. Choose a topic below to get started.
| 1. | Where the nodal point for National Measurement System is located? | 
| A. | Bangalore | 
| B. | Patna | 
| C. | Bombay | 
| D. | New Delhi | 
| Answer» E. | |
| 2. | Which of the following option is not correct regarding QA and QC? | 
| A. | Process capabilities should be monitored on intermittent basis | 
| B. | Measuring equipment’s must have a calibration certificate | 
| C. | Normally many inspections are done during the process of manufacturing | 
| D. | QA depends on the activities of the entire company | 
| Answer» B. Measuring equipment’s must have a calibration certificate | |
| 3. | Which of the following is an example of QA? | 
| A. | Verification | 
| B. | Software testing | 
| C. | Validation | 
| D. | Documentation | 
| Answer» B. Software testing | |
| 4. | What does QA and QC stand for? | 
| A. | Quality Assurance and Queuing Control | 
| B. | Quality Adjustment and Quality completion | 
| C. | Quality Assurance and Quality control | 
| D. | Quality Adjustment and Queuing control | 
| Answer» D. Quality Adjustment and Queuing control | |
| 5. | WHICH_OF_THE_FOLLOWING_IS_AN_EXAMPLE_OF_QA??$ | 
| A. | Verification | 
| B. | Software testing | 
| C. | Validation | 
| D. | Documentation | 
| Answer» B. Software testing | |
| 6. | Which_of_the_following_option_is_not_correct_regarding_QA_and_QC?$ | 
| A. | Process capabilities should be monitored on intermittent basis | 
| B. | Measuring equipment’s must have a calibration certificate | 
| C. | Normally many inspections are done during the process of manufacturing | 
| D. | QA depends on the activities of the entire company | 
| Answer» E. | |
| 7. | A-3, B-4, C-2, D-? | 
| A. | A-2, B-3, C-1, D-4 | 
| B. | A-1, B-3, C-4, D-2 | 
| C. | A-4, B-1, C-3, D-2 | 
| Answer» B. A-1, B-3, C-4, D-2 | |
| 8. | What is the first step of QA? | 
| A. | Development of standards | 
| B. | Identification of customer need | 
| C. | Servicing | 
| D. | Material control | 
| Answer» C. Servicing | |
| 9. | Arrange the steps of QA in ascending order? | 
| A. | Customer needs, material control, design development, process control, marketing | 
| B. | Material control, process control, customer need, design development, finished product | 
| C. | Customer needs, design development, material control, process control, finished product | 
| D. | Material control, servicing, process control, material control, design development | 
| Answer» D. Material control, servicing, process control, material control, design development | |
| 10. | Which of the following option involves material and component control? | 
| A. | Development of standards | 
| B. | Development of specification | 
| C. | Quality control | 
| D. | Feedback | 
| Answer» D. Feedback | |
| 11. | Which of the following option is correct regarding QA and QC? | 
| A. | QC is an integral part of QA | 
| B. | QA is an integral part of QC | 
| C. | QA and QC are independent to each other | 
| D. | QC may or may not depend on QA | 
| Answer» B. QA is an integral part of QC | |
| 12. | What is QA? | 
| A. | It is the measurement of degree to which a product satisfies the need | 
| B. | Any systematic process used to ensure quality in the process | 
| C. | Process of identifying defects | 
| D. | It is a corrective tool | 
| Answer» C. Process of identifying defects | |
| 13. | What is the full form of QA And QC in Metrology Quality Assurance? | 
| A. | Quality Assurance and Queuing Control | 
| B. | Quality Adjustment and Quality completion | 
| C. | Quality Assurance and Quality control | 
| D. | Quality Adjustment and Queuing control | 
| Answer» D. Quality Adjustment and Queuing control | |