

MCQOPTIONS
Saved Bookmarks
This section includes 5 Mcqs, each offering curated multiple-choice questions to sharpen your Mechatronics knowledge and support exam preparation. Choose a topic below to get started.
1. |
Prototyping involves ____ |
A. | Conceptual design |
B. | Replacing non-computer systems with actual hardware |
C. | Database for maintaining project information |
D. | Sub models for eventual reuse |
Answer» C. Database for maintaining project information | |
2. |
Describing the behavior characteristics through block diagram is done in ____ |
A. | Modeling and simulation |
B. | Prototyping |
C. | Deployment |
D. | Design optimization |
Answer» B. Prototyping | |
3. |
What is the function of “analysis” in the modeling and simulation phase? |
A. | Database for maintaining project information |
B. | Sub models for eventual reuse |
C. | Contains Numerical methods |
D. | To produce high-level source code |
Answer» D. To produce high-level source code | |
4. |
Microprocessor based electrical motors are used for ____ |
A. | Prediction of fault in the system |
B. | Correction before a fault occurs |
C. | Actuation purpose in robots |
D. | Providing intelligence |
Answer» D. Providing intelligence | |
5. |
In the level of integration of Mechatronics system, an example of the first level is _____ |
A. | Fluid valves |
B. | Automatic machine tools |
C. | Industrial robots |
D. | Microprocessors |
Answer» B. Automatic machine tools | |