1. |
If the loss of prestress is excessive resulting in tensile cracks, which method should be used? |
A. | Preloading method |
B. | Hollow method |
C. | Transparent method |
D. | Layered method |
Answer» B. Hollow method | |
2. |
In the case of dormant cracks wider than about 1m, it is more economical to use ____________ |
A. | Epoxy resin |
B. | Grouting |
C. | Tensioning |
D. | Ranging |
Answer» C. Tensioning | |
3. |
In case of bridge greater than 10.7m in height and which cannot be inspected from beneath due to watery situation the instrument suited for inspection work is? |
A. | Electrical resistance meter |
B. | Strain gauges |
C. | Barins snooper vehicle |
D. | Rain guages |
Answer» D. Rain guages | |
4. |
The pachometer is used to locate the ____________ |
A. | Steel reinforcement |
B. | Aluminium reinforcement |
C. | Tensile reinforcement |
D. | Surface reinforcement |
Answer» B. Aluminium reinforcement | |
5. |
One of the testing equipments used for inspection is? |
A. | Strain gauges |
B. | Measuring jar |
C. | Test tubes |
D. | None of the mentioned |
Answer» B. Measuring jar | |
6. |
Prestressed concrete structures showing visible signs of distress in the form of ____________ |
A. | Surface cracks |
B. | Patterns |
C. | Patches |
D. | None of the mentioned |
Answer» B. Patterns | |
7. |
The structural concrete slab panels can be repaired by ____________ |
A. | Internal bonding |
B. | External bonding |
C. | Stress bonding |
D. | Layered bonding |
Answer» C. Stress bonding | |
8. |
Maintaining prestressed concrete structures of various types in a fit and serviceable condition is primary function of ____________ |
A. | Maintenance engineer |
B. | Design engineer |
C. | Surface engineer |
D. | Structural engineer |
Answer» B. Design engineer | |
9. |
What is the problem of rehabilitation? |
A. | Unique |
B. | Submerged |
C. | Lined |
D. | Layered |
Answer» B. Submerged | |
10. |
Rehabilitation of structures may be required due to several reasons. Choose the correct reason. |
A. | Environmental effects |
B. | Tensile effects |
C. | Compressive effects |
D. | Range effects |
Answer» B. Tensile effects | |
11. |
In prestressed concrete structures the primary problem is damaged caused to ____________ |
A. | Bridge decks |
B. | Spans |
C. | Anchorages |
D. | Ridges |
Answer» D. Ridges | |