This section includes 7 Mcqs, each offering curated multiple-choice questions to sharpen your Railway Engineering knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
Excessive lifting can be done if work is done under speed restrictions. |
| A. | True |
| B. | False |
| Answer» B. False | |
| 2. |
What can be done to remove the Centre bound sleeper defect? |
| A. | Lifting of track |
| B. | Over packing of joints |
| C. | Loosening the ballast at ends |
| D. | Loosening the ballast at the centre |
| Answer» E. | |
| 3. |
Which of the following activity must be done when the track undergoes regrading? |
| A. | Lifting of track |
| B. | Providing drainage facilities |
| C. | Replacing the joints |
| D. | Adjusting the creep |
| Answer» B. Providing drainage facilities | |
| 4. |
Which of the following is correct in case of pumping joints? |
| A. | It pumps out mud and water |
| B. | It pumps out only mud |
| C. | It pumps out fine dust |
| D. | It occurs in dry season |
| Answer» B. It pumps out only mud | |
| 5. |
What can happen if there is provision of wooden sleepers in a track that is normally laid with metal sleepers? |
| A. | Hogging of rails |
| B. | Sagging of rails |
| C. | High joints |
| D. | Pumping joints |
| Answer» D. Pumping joints | |
| 6. |
What should preferably be done to remove hogging if it occurs on a small scale? |
| A. | Cropping the hogged portion |
| B. | Dehogging machine |
| C. | Over packing of joint sleepers |
| D. | Replacing the whole rail |
| Answer» D. Replacing the whole rail | |
| 7. |
What is hogging of joints? |
| A. | Depression of rail ends at joints |
| B. | Depression of the middle part of the rail |
| C. | Corrosion of joints |
| D. | Staggering of rails |
| Answer» B. Depression of the middle part of the rail | |