1. |
Line Maintenance is also known as _________ |
A. | Heavy Maintenance |
B. | Electrical Maintenance |
C. | General Maintenance |
D. | Routine Maintenance |
Answer» E. | |
2. |
Line maintenance is less extensive than Heavy maintenance. |
A. | True |
B. | False |
Answer» B. False | |
3. |
Line maintenance can be both, scheduled or unscheduled. |
A. | True |
B. | False |
Answer» B. False | |
4. |
How much time is required for line maintenance? |
A. | 45 minutes |
B. | 450 minutes |
C. | 45 hours |
D. | 450 hours |
Answer» B. 450 minutes | |
5. |
Which one of the following is not true with respect to LRU? |
A. | Increases system costs |
B. | Improves quality |
C. | Can be stocked |
D. | Can be replaced quickly |
Answer» B. Improves quality | |
6. |
What is the full form of LRU? |
A. | Line-replaced unit |
B. | Line-repositioned unit |
C. | Line-rested unit |
D. | Line-replaceable unit |
Answer» E. | |
7. |
Preflight inspection is conducted by __________ |
A. | Copilot |
B. | Pilot |
C. | Purser |
D. | Ground staff |
Answer» C. Purser | |
8. |
Out of the following, which is not an important factor affecting the work of the line maintenance engineer? |
A. | Time |
B. | Weather |
C. | Ground staff |
D. | Fuel |
Answer» B. Weather | |
9. |
What is the full form of SRM? |
A. | Structure Repair Manual |
B. | Structure Repairing Manual |
C. | Structural Repair Manual |
D. | Structural Repairing Manual |
Answer» B. Structure Repairing Manual | |
10. |
Which one of the following is not true with respect to line maintenance? |
A. | Quick turnaround time |
B. | Aircraft is refueled |
C. | Critical instruments are checked for defects |
D. | Performed at MRO sites |
Answer» E. | |
11. |
Line maintenance is carried out at the apron. |
A. | True |
B. | False |
Answer» B. False | |