1. |
The Remodelling of canal system is done to __________ |
A. | beautify the canal surroundings |
B. | correct deformations in the canal |
C. | exhibit the canal in exhibition |
D. | widen up the channel section |
Answer» C. exhibit the canal in exhibition | |
2. |
Berm is _____________ |
A. | a horizontal strip at the N.S.L |
B. | a device to remove silt |
C. | another name of the canal bank |
D. | a gap created in the bank of the canal |
Answer» B. a device to remove silt | |
3. |
In Long reach system, only a portion of full supply discharge is taken in the compartment. |
A. | True |
B. | False |
Answer» C. | |
4. |
In the external silting method, subsidiary banks are constructed which run parallel to canal main banks. |
A. | True |
B. | False |
Answer» B. False | |
5. |
Which of the following statement is wrong about the internal silting method? |
A. | The extra strength is gained by increasing the section of the banks |
B. | The additional soil is derived from the natural process of silting internally |
C. | This method of strengthening the canal is very cheap, simple and efficient |
D. | To decelerate the silting process low submersible spurs may be constructed |
Answer» E. | |
6. |
Internal silting method and external silting method are the methods of ________________ |
A. | strengthening of canal banks |
B. | formation of berms |
C. | silt removal |
D. | formation of breaches |
Answer» B. formation of berms | |
7. |
Which of the following is not a preventive measure for the maintenance of the canal? |
A. | Strengthening of canal banks |
B. | Formation of berms by internal silting |
C. | Provision of Pushta or cover to the saturation line |
D. | Silt removal |
Answer» E. | |
8. |
Which of the following is not a reason which leads to a canal breach? |
A. | Due to faulty design and construction of banks |
B. | Due to leakage or piping |
C. | Due to the maintenance of service roads |
D. | Due to intentional cuts made by cultivators |
Answer» D. Due to intentional cuts made by cultivators | |
9. |
The berms help in checking excessive loss of water due to seepage. |
A. | True |
B. | False |
Answer» B. False | |