| 1. | The land area required for installation of nuclear power plant is ________ | 
| A. | more than thermal power plant | 
| B. | less than thermal power plant | 
| C. | equel to thermal power plant | 
| D. | depends on type of construction | 
| Answer» D. depends on type of construction | |
| 2. | Breeder reactor employs liquid-metal coolant, because it | 
| A. | acts as good moderator | 
| B. | produces maximum steam | 
| C. | transfers heat from core at a fast rate | 
| D. | increases rate of reaction in core | 
| Answer» D. increases rate of reaction in core | |
| 3. | In cooling towers, the heat is dissipated mainly by | 
| A. | Convection | 
| B. | Conduction | 
| C. | Radiation | 
| D. | Evaporation | 
| Answer» E. | |
| 4. | In the Canada Deuterium Uranium (CANDU) reactor, a natural uranium-fuelled reactor, the function of moderator and coolant is performed by: | 
| A. | heavy water | 
| B. | light water | 
| C. | carbon dioxide | 
| D. | sodium | 
| Answer» B. light water | |
| 5. | ALL_OF_THE_NUCLEAR_FUEL_RESERVE_WILL_BE_ENDED_IN_ABOUT_400_YEARS.?$ | 
| A. | True | 
| B. | False | 
| Answer» C. | |
| 6. | Operating cost of nuclear power plant is less than thermal power plant.$ | 
| A. | True | 
| B. | False | 
| Answer» B. False | |
| 7. | With_respect_to_the_load_centre_which_location_is_suitable_for_stablishment_of_nuclear_power_plant?$ | 
| A. | Load centre | 
| B. | Near load centre but at reasonable distance | 
| C. | Far away from load centre | 
| D. | Near chemical industries | 
| Answer» C. Far away from load centre | |
| 8. | The land area required for installation of nuclear power plant is _______? | 
| A. | more than thermal power plant | 
| B. | less than thermal power plant | 
| C. | equel to thermal power plant | 
| D. | depends on type of construction | 
| Answer» D. depends on type of construction | |
| 9. | What is the overall efficiency of nuclear power plant? | 
| A. | 20 to 25% | 
| B. | 25 to 30% | 
| C. | 30 to 40 % | 
| D. | 50 to 70 % | 
| Answer» D. 50 to 70 % | |
| 10. | Which of the following are not taken as operation and maintenance cost in economics of nuclear power plant? | 
| A. | Taxes and insurance | 
| B. | Salaries and wages of staff | 
| C. | Cost of waste disposal | 
| D. | Cost of processing materials | 
| Answer» B. Salaries and wages of staff | |
| 11. | In economics of nuclear power plant taxes and insurance charges are taken as _______ | 
| A. | operating cost | 
| B. | maintenance cost | 
| C. | capital cost | 
| D. | fixed cost | 
| Answer» E. | |
| 12. | Cost of nuclear fuel in nuclear power plant economics is considered as __________ | 
| A. | running cost | 
| B. | maintenance cost | 
| C. | capital cost | 
| D. | development cost | 
| Answer» D. development cost | |
| 13. | Nuclear fuel in reactor lasts for ________________ | 
| A. | more than 5 months | 
| B. | few weeks | 
| C. | few days | 
| D. | more than 5 years | 
| Answer» E. | |
| 14. | How much coal is required to generate energy equivalent to the energy generated by 1 kg of uranium? | 
| A. | 30000 tonnes of high grade coal | 
| B. | 300 tonnes of high grade coal | 
| C. | 10000 tonnes of high grade coal | 
| D. | 3000 tonnes of high grade coal | 
| Answer» E. | |
| 15. | The best capable alternative source which can meet the future energy demand is _____________ | 
| A. | thermal power plant | 
| B. | nuclear power plant | 
| C. | hydroelectric power plant | 
| D. | geothermal power plant | 
| Answer» C. hydroelectric power plant | |