This section includes 22 Mcqs, each offering curated multiple-choice questions to sharpen your Software Engineering knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
------------- encompass a broad array of tasks that include project planning and |
| A. | Software engineering tools |
| B. | Software engineering Procedures |
| C. | Software engineering Methods |
| D. | None of these |
| Answer» B. Software engineering Procedures | |
| 2. |
-----------------is concerned with how a systems tied together in order to achieve common |
| A. | Interaction |
| B. | Interdependence |
| C. | Integration |
| D. | Central Objective |
| Answer» D. Central Objective | |
| 3. |
In ----------- analyst examines information that has been recorded about system and about |
| A. | Record Review |
| B. | Interviews |
| C. | Questionnaires |
| D. | Observation |
| Answer» C. Questionnaires | |
| 4. |
Analyst used --------- method to collect information from person by asking standard |
| A. | Interviews |
| B. | Questionnaires. |
| C. | Record inspection or view |
| D. | Observations |
| Answer» B. Questionnaires. | |
| 5. |
Analyst use ----------to learn about feelings, opinions and general experiences or to explore |
| A. | open ended questionnaires |
| B. | Close ended questionnaires |
| C. | Record Inspection |
| D. | Observation |
| Answer» B. Close ended questionnaires | |
| 6. |
-------- refers to the process of examining a business situation with the intent of improving |
| A. | Software Anticipation |
| B. | Software Investigation |
| C. | Software Requirement |
| D. | System analysis |
| Answer» B. Software Investigation | |
| 7. |
-------------is a unit that is part of a larger system that means a larger system divided into |
| A. | Execution Information system(EIS) |
| B. | Integrated system |
| C. | Subsystem |
| D. | Transaction processing system |
| Answer» D. Transaction processing system | |
| 8. |
-------- interviews use of standardized question in either an open response or close |
| A. | Unstructured Interviews. |
| B. | Structured Interviews |
| C. | Questionnaires. |
| D. | Record inspection or view |
| Answer» C. Questionnaires. | |
| 9. |
-------- refers to the process of examining a business situation with the intent of improving it |
| A. | Software Anticipation |
| B. | Software Investigation |
| C. | Software Requirement |
| D. | System analysis |
| Answer» E. | |
| 10. |
---------------It shows the flow of material ,energy and information that hold system |
| A. | Schematic Models |
| B. | Flow system models |
| C. | Static system models |
| D. | Dynamic system models |
| Answer» C. Static system models | |
| 11. |
A ---------------is a set or group of component that interact to accomplish some |
| A. | System |
| B. | Software |
| C. | Subsystem |
| D. | Physical system |
| Answer» B. Software | |
| 12. |
Decision makers who are concerned with tactical (short-term) operational problems and |
| A. | middle managers |
| B. | executive managers |
| C. | supervisors |
| D. | mobile managers |
| Answer» B. executive managers | |
| 13. |
------------------system operates continuously to keep management abreast of what is |
| A. | Execution Information system(EIS) |
| B. | Integrated system |
| C. | Subsystem |
| D. | Transaction processing system |
| Answer» B. Integrated system | |
| 14. |
We can define information system as a set of devices, procedures, rules but most of the |
| A. | Formal Information system |
| B. | Manmade Information system |
| C. | Informal information system |
| D. | All of above |
| Answer» C. Informal information system | |
| 15. |
-------------systems used organizational data as well as external data collected from |
| A. | Formal Information system |
| B. | Closed system |
| C. | MIS |
| D. | DSS |
| Answer» E. | |
| 16. |
______ is an orderly grouping of independent components linked together |
| A. | System |
| B. | Software |
| C. | Subsystem |
| D. | Physical system |
| Answer» B. Software | |
| 17. |
------------- This type of model exhibits are pair of relationship such as activity time or cost |
| A. | Schematic Models |
| B. | Flow system models |
| C. | Static system models |
| D. | Dynamic system models |
| Answer» D. Dynamic system models | |
| 18. |
MTBF stands for |
| A. | Mean time between failure |
| B. | Maximum time between failures |
| C. | Minimum time between failures |
| D. | Many time between failures |
| Answer» B. Maximum time between failures | |
| 19. |
NHPP stands for |
| A. | Non Homogeneous Poisson Process |
| B. | Non Heterogeneous Poisson Process |
| C. | Non Homogeneous Poisson Product |
| D. | Non Heterogeneous Poisson Product |
| Answer» B. Non Heterogeneous Poisson Process | |
| 20. |
QFD in requirement engineering stands for |
| A. | Quality function design |
| B. | Quality factor design |
| C. | Quality function development |
| D. | Quality function deployment |
| Answer» E. | |
| 21. |
ERD stands for |
| A. | Entity relationship diagram |
| B. | Exit related diagram |
| C. | Entity relationship design |
| D. | Exit related design |
| Answer» B. Exit related diagram | |
| 22. |
SRS stands for |
| A. | Software requirements specification |
| B. | System requirements specification |
| C. | Systematic requirements specifications |
| D. | None of the above |
| Answer» B. System requirements specification | |