

MCQOPTIONS
Saved Bookmarks
This section includes 5 Mcqs, each offering curated multiple-choice questions to sharpen your Petroleum Production Operations knowledge and support exam preparation. Choose a topic below to get started.
1. |
Which of the following requires a well intervention (workover)? |
A. | Determining a well s total production flow rate |
B. | Shutting off flow from a high water cut interval |
C. | Measuring a well s percentage of oil, gas and water production |
D. | The breaking emulsion formed between a well s produced oil and water |
Answer» C. Measuring a well s percentage of oil, gas and water production | |
2. |
Which of the following is most likely to produce sand? |
A. | High rate oil production in unconsolidated oil-wet sand |
B. | High water cut production in an oil-wet carbonate |
C. | High rate gas production in tight gas sand |
D. | During Packer Setting |
Answer» B. High water cut production in an oil-wet carbonate | |
3. |
Which of the following is not a cause of sand production? |
A. | Running casing |
B. | Lowered reservoir pressure |
C. | Drag from produced fluids |
D. | Poor consolidation |
Answer» B. Lowered reservoir pressure | |
4. |
Which of the following parameters has no effect on the IPR of a reservoir? |
A. | Perforation skin |
B. | Formation permeability |
C. | Production tubing diameter |
D. | Reservoir boundary condition |
Answer» D. Reservoir boundary condition | |
5. |
What is the maximum allowable size of solids contained in the fluid in contact with the formation? |
A. | 20 micron |
B. | 10 micron |
C. | 5 micron |
D. | 2 micron |
Answer» E. | |