1.

The expansion cost of FMS (Flexible manufacturing system) is less.

A. True
B. False
Answer» C.
2.

Which does SMC stand for with respect to machine related manufacturing?

A. Single machine control
B. Singular machine control
C. Slot machine cell
D. Single machine cell
Answer» E.
3.

FMS (Flexible manufacturing system) is not suitable if production quantity is less.

A. True
B. False
Answer» B. False
4.

FMS (Flexible manufacturing system) consist of a single machine that controls everything.

A. True
B. False
Answer» C.
5.

Which work cannot be done by Jerome H. Lemelson s first robot based system?

A. Manufacturing product
B. Welding
C. Inspecting the product
D. Convey the product
Answer» B. Welding
6.

Which development board uses energia IDE (Integrated development environment) for its programming?

A. MSP430G2ET Launchpad
B. Arduino UNO
C. Arduino nano
D. NodeMCU
Answer» B. Arduino UNO
7.

What happens to labour workforce when FMS (Flexible manufacturing system) concept is used?

A. Increases
B. Decreases
C. Remains same
D. Gradually increases with time
Answer» C. Remains same
8.

Which is not a property of FMS (Flexible manufacturing system)?

A. High accuracy
B. Less production cost
C. Less initial cost
D. Flexibility in production
Answer» D. Flexibility in production
9.

What was the original design of Jerome H. Lemelson which he patented for FMS (Flexible manufacturing system)?

A. Robot based system
B. Conveyer
C. Motor based pulley
D. Shredder
Answer» B. Conveyer
10.

Anyone can operate FMS (Flexible manufacturing system).

A. True
B. False
Answer» C.
11.

Flexible manufacturing system (FMS) lowers the company s production cost.

A. True
B. False
Answer» B. False
12.

Which is a false statement on FMS (Flexible manufacturing system)?

A. Accuracy in the final goods produced is high
B. The cost of production is less
C. Quality and quantity of produced goods can be changed easily
D. The cost of initial setup is less due to less labour cost
Answer» E.
13.

What is done in make-to-order production?

A. Production is ordered by the owner
B. Regular production
C. Production stops due to less order
D. Production is done according to customer requirements
Answer» E.
14.

When did Jerome H. Lemelson set up his factory based on FMS (Flexible manufacturing system)?

A. Early 1950 s
B. Early 1940 s
C. Late 1940 s
D. Late 1960 s
Answer» E.
15.

Who developed FMS (Flexible manufacturing system)?

A. Jerome H. Lemelson
B. Charles Wheatstone
C. Charles manes
D. Samuel Hunter Christie
Answer» B. Charles Wheatstone