				This section includes 14 Mcqs, each offering curated multiple-choice questions to sharpen your Railway Engineering knowledge and support exam preparation. Choose a topic below to get started.
| 1. | Which among the following is not included in the Appendices to the report? | 
| A. | Historical and geographical aspects | 
| B. | Route selection and project description | 
| C. | Location report | 
| D. | Rates for construction work | 
| Answer» C. Location report | |
| 2. | What is the order of arrangement of documents in the Report? | 
| A. | Index, Report, Covering note | 
| B. | Covering note, Index, Report, List of drawings, Appendices | 
| C. | Index, Covering note, Report, List of drawings, Appendices | 
| D. | Covering note, Index, Report, Appendices | 
| Answer» C. Index, Covering note, Report, List of drawings, Appendices | |
| 3. | Which section comments on the availability of water for various construction activities and its appropriateness for consumption? | 
| A. | Project Engineering | 
| B. | Estimation and cost of construction | 
| C. | Project Organisation | 
| D. | Environmental Section | 
| Answer» D. Environmental Section | |
| 4. | Which section focuses on the problems that might be encountered, identifying areas requiring special attention and providing knowledge and information for finding solutions? | 
| A. | Project Engineering | 
| B. | Route selection | 
| C. | Signalling and Telecommunication | 
| D. | Estimation of cost and construction schedule | 
| Answer» B. Route selection | |
| 5. | What are the other details provided in the segment Standard of construction ? | 
| A. | Road crossings and station machinery | 
| B. | Only the station machinery | 
| C. | Residential accommodation | 
| D. | Road crossings, station machinery and residential accommodation | 
| Answer» E. | |
| 6. | Which segment in the project report provides information and data related to the different routes that were examined for construction of the new rail line? | 
| A. | Route selection | 
| B. | Signalling and Telecommunication | 
| C. | Other details | 
| D. | Ruling gradient | 
| Answer» B. Signalling and Telecommunication | |
| 7. | The Permanent way section of the report does not give details about which of the following aspects? | 
| A. | The rail section adopted | 
| B. | The depth of the Ballast cushion | 
| C. | Whether or not to weld the rails | 
| D. | Type and density of sleepers provided | 
| Answer» C. Whether or not to weld the rails | |
| 8. | What does Category of a line indicates? | 
| A. | Maximum speed potential of the line | 
| B. | Maximum axel load | 
| C. | Loading standard of the bridges | 
| D. | Maximum speed potential, axel load and loading standard of the bridges | 
| Answer» E. | |
| 9. | In Characteristics of the Project Areas the geographical features of the country are given. These features do not affect the _______ | 
| A. | alignment of the rail line | 
| B. | future prospects of proposed line | 
| C. | cost of construction | 
| D. | hauling capacity of the train | 
| Answer» E. | |
| 10. | Which points should be considered while selecting the best alignment in Final location survey? | 
| A. | Correct obligatory points and minimum cost of construction | 
| B. | Ease and minimum cost of construction | 
| C. | Correct obligatory points and potential for high speeds | 
| D. | Ease and minimum cost of construction, correct obligatory points and potential for high speeds | 
| Answer» E. | |
| 11. | In Final location survey at which points Masonry pillars are built? | 
| A. | Tangent point of curves | 
| B. | At start and end of curves | 
| C. | At tangent points and along the centre line | 
| D. | Along the centre line of curves | 
| Answer» D. Along the centre line of curves | |
| 12. | In Preliminary survey the total alignment is traversed with a Theodolite, but it is not necessary in Final location survey. | 
| A. | True | 
| B. | False | 
| Answer» C. | |
| 13. | What is the objective of Final location survey? | 
| A. | To study the contour maps | 
| B. | To prepare working details | 
| C. | To make accurate cost estimates | 
| D. | To prepare working details and make accurate cost estimates | 
| Answer» E. | |
| 14. | When is the Final Location survey done? | 
| A. | After the particular Railway line to be constructed is decided | 
| B. | After the Traffic survey | 
| C. | After Reconnaissance survey | 
| D. | Immediately after the collection of Field data | 
| Answer» B. After the Traffic survey | |