1.

Which of the following failures generally occur due to the development of unaccounted pore pressures?

A. Hydraulic failures
B. Piping through the dam body
C. Sliding in embankments
D. Sloughing of the d/s toe
Answer» D. Sloughing of the d/s toe
2.

In order to keep the saturation line in a canal embankment well within the toe, it is necessary to provide _____________________

A. spoil bank
B. counter berm
C. freeboard
D. berm
Answer» C. freeboard
3.

When the reservoir is full, the slope which is most likely to slide is _____________________

A. the upstream slope
B. the downstream slope
C. both upstream and downstream slope
D. no effect
Answer» C. both upstream and downstream slope
4.

What is the most critical condition of slide of the U/s slope?

A. The sudden drawdown of the reservoir
B. Reservoir full condition
C. Steady seepage condition
D. Sudden drawdown and reservoir full condition
Answer» B. Reservoir full condition
5.

In foundation slide failure___________________________

A. top of embankment gets cracked and lower slope moves outward forming large mud waves near the heel
B. top of embankment gets cracked and lower slope moves inward forming large mud waves near the heel
C. bottom of embankment gets cracked and lower slope moves outward forming large mud waves near the heel
D. bottom of embankment gets cracked and lower slope moves inward forming large mud waves near the heel
Answer» B. top of embankment gets cracked and lower slope moves inward forming large mud waves near the heel
6.

Sloughing is the process of _________________

A. progressive erosion
B. subsequent removal of soil grains from within the dam
C. uncontrolled seepage through the dam body
D. progressive removal of soil from the D/s face
Answer» E.
7.

In order to prevent the possibility of the cross-flow towards the earthen embankments, it is necessary to provide _____________________

A. counter berms
B. sides walls of sufficient height and length
C. spoil banks
D. sufficient freeboard
Answer» C. spoil banks
8.

The collection and removal of water before it acquires high downward velocities is ensured by provision of ____________________

A. berms
B. freeboard
C. burrow pits
D. spoil banks
Answer» B. freeboard
9.

Provision of sufficient freeboard eliminates _______________ Which of the following is/are correct?

A. i and v
B. ii and iii
C. iv and v
D. i and ivView Answer
Answer» E.
10.

Stone pitching or riprap is generally provided to avoid _______________

A. over-topping
B. erosion of U/s and d/s face
C. cracking due to frost action
D. gully formation
Answer» C. cracking due to frost action