1. |
Which of the following failures generally occur due to the development of unaccounted pore pressures? |
A. | Hydraulic failures |
B. | Piping through the dam body |
C. | Sliding in embankments |
D. | Sloughing of the d/s toe |
Answer» D. Sloughing of the d/s toe | |
2. |
In order to keep the saturation line in a canal embankment well within the toe, it is necessary to provide _____________________ |
A. | spoil bank |
B. | counter berm |
C. | freeboard |
D. | berm |
Answer» C. freeboard | |
3. |
When the reservoir is full, the slope which is most likely to slide is _____________________ |
A. | the upstream slope |
B. | the downstream slope |
C. | both upstream and downstream slope |
D. | no effect |
Answer» C. both upstream and downstream slope | |
4. |
What is the most critical condition of slide of the U/s slope? |
A. | The sudden drawdown of the reservoir |
B. | Reservoir full condition |
C. | Steady seepage condition |
D. | Sudden drawdown and reservoir full condition |
Answer» B. Reservoir full condition | |
5. |
In foundation slide failure___________________________ |
A. | top of embankment gets cracked and lower slope moves outward forming large mud waves near the heel |
B. | top of embankment gets cracked and lower slope moves inward forming large mud waves near the heel |
C. | bottom of embankment gets cracked and lower slope moves outward forming large mud waves near the heel |
D. | bottom of embankment gets cracked and lower slope moves inward forming large mud waves near the heel |
Answer» B. top of embankment gets cracked and lower slope moves inward forming large mud waves near the heel | |
6. |
Sloughing is the process of _________________ |
A. | progressive erosion |
B. | subsequent removal of soil grains from within the dam |
C. | uncontrolled seepage through the dam body |
D. | progressive removal of soil from the D/s face |
Answer» E. | |
7. |
In order to prevent the possibility of the cross-flow towards the earthen embankments, it is necessary to provide _____________________ |
A. | counter berms |
B. | sides walls of sufficient height and length |
C. | spoil banks |
D. | sufficient freeboard |
Answer» C. spoil banks | |
8. |
The collection and removal of water before it acquires high downward velocities is ensured by provision of ____________________ |
A. | berms |
B. | freeboard |
C. | burrow pits |
D. | spoil banks |
Answer» B. freeboard | |
9. |
Provision of sufficient freeboard eliminates _______________ Which of the following is/are correct? |
A. | i and v |
B. | ii and iii |
C. | iv and v |
D. | i and ivView Answer |
Answer» E. | |
10. |
Stone pitching or riprap is generally provided to avoid _______________ |
A. | over-topping |
B. | erosion of U/s and d/s face |
C. | cracking due to frost action |
D. | gully formation |
Answer» C. cracking due to frost action | |