1.

Laying cement concrete 6beldars, 8 mazdoors, Bhishti and mason can do 2.83 cu m(100 cu ft) per day.

A. True
B. False
Answer» C.
2.

Centring and shuttering for flat surfaces- 4 beldars and 4 carpenters (2 class) can do 9.6 sq m (96 sq ft) per day.

A. True
B. False
Answer» B. False
3.

For panelled, glazed, etc., shutters- 15 carpenters and 4 beldars can make and fix 4 shutters 40 mm thick size 2.00m*1.15m.

A. True
B. False
Answer» B. False
4.

For a framed multi-storeyed building the area occupied by wall may be 50% to 70% of the plinth area.

A. True
B. False
Answer» C.
5.

The carpet area of an office building may be 60% to 75% of plinth area of the building with a target of 75%.

A. True
B. False
Answer» B. False
6.

The approximate cost of a building of cubic content of 400 cu m@ Rs.180/- per cu m is __________

A. Rs. 92000/-
B. Rs. 12000/-
C. Rs. 72000/-
D. Rs. 42000/-
Answer» D. Rs. 42000/-
7.

A bullock cart can carry about _________ load.

A. 3 tonne
B. 1 tonne
C. 5 tonne
D. tonne
Answer» C. 5 tonne
8.

In flooring how many masons, beldars, mazdoors and bhishti per day are required?

A. 4 Beldars, 10 Mazdoors, 10 Masons and 8 Bhishti
B. 4 Beldars, 3 Mazdoors, 5 Masons and 1 Bhishti
C. 9 Beldars, 13 Mazdoors, 5 Masons and 1 Bhishti
D. 3 Mazdoors, 5 Masons and 10 Bhishti
Answer» C. 9 Beldars, 13 Mazdoors, 5 Masons and 1 Bhishti
9.

In earthwork per 28.30 cu m, how many beldars and mzdoors are required per day?

A. 15 Beldars and 8 Mazdoors
B. 0 Beldars and 14 Mazdoors
C. 2 Beldars and 0 Mazdoors
D. 5 Beldars and 4 Mazdoors
Answer» E.
10.

The capacity of doing work by an artesian or skilled labour in the form of quantity of work per day is known as the ______________

A. over-turn
B. in-turn
C. out-turn
D. out-come
Answer» D. out-come
11.

______________ include general office expenses, rents, taxes, supervision and other costs which are indirect expenses and not productive expenses on the job.

A. Total costs
B. General costs
C. Overhead costs
D. Contingencies
Answer» D. Contingencies
12.

___________ of building is the useful area or liveable area or lettable area. This is the total floor area minus the circulation area, verandahs, corridors, passages, staircase, lifts, entrance hall, etc. minus other non-useable areas.

A. Plinth area
B. Floor area
C. Carpet area
D. Circulation area
Answer» D. Circulation area
13.

_________________ area of a building is the area of verandahs, passage, corridors, balconies, porches, etc.

A. Floor area
B. Horizontal circulation area
C. Vertical circulation area
D. Verandah area
Answer» C. Vertical circulation area
14.

____________ is a list or schedule of quantities of all the possible items of work required for construction of any building or structure.

A. Quality survey
B. Rate list
C. Quantity survey
D. Rate schedule
Answer» D. Rate schedule
15.

__________ is the built up covered area of a building measured at floor level of any storey.

A. Covered area
B. Carpet area
C. Total area
D. Plinth area
Answer» E.