| 1. | Coincidence factor is reciprocal of ___________ | 
| A. | average load | 
| B. | demand factor | 
| C. | capacity factor | 
| D. | diversity factor | 
| Answer» E. | |
| 2. | The load factor is __________ | 
| A. | always less than unity | 
| B. | less than or greater than 1 | 
| C. | always greater than 1 | 
| D. | less than zero | 
| Answer» B. less than or greater than 1 | |
| 3. | The primary reason for low power factor is supply system is due to installation of | 
| A. | induction motors | 
| B. | synchronous motors | 
| C. | single phase motors | 
| D. | d.c. motors | 
| Answer» B. synchronous motors | |
| 4. | which of the following plants ? | 
| A. | Base load plants | 
| B. | Peak load plants | 
| C. | Both (A) and (B) | 
| D. | none of the above | 
| Answer» C. Both (A) and (B) | |
| 5. | During load shedding | 
| A. | system power factor is changed | 
| B. | some loads are switched off | 
| C. | system voltage is reduced | 
| D. | system frequency is reduced Efficiency is the secondary consideration in | 
| Answer» C. system voltage is reduced | |
| 6. | Diversity factor has direct effect on the | 
| A. | fixed cost of unit generated | 
| B. | running cost of unit generated | 
| C. | both (A) and (B) | 
| D. | neither (A) nor (B) | 
| Answer» B. running cost of unit generated | |
| 7. | Which of the following power plants need the least period for installation ? | 
| A. | Thermal power plant | 
| B. | Diesel power plant | 
| C. | Nuclear power plant | 
| D. | Hydro-electric power plant | 
| Answer» C. Nuclear power plant | |
| 8. | Annual instalment towards depreciation reduces as rate of interest increases with | 
| A. | sinking fund depreciation | 
| B. | straight line depreciation | 
| C. | reducing balances depreciation | 
| D. | none of the above | 
| Answer» B. straight line depreciation | |
| 9. | Which plant can never have 100 percent load factor ? | 
| A. | Peak load plant | 
| B. | Base load plant | 
| C. | Nuclear power plant | 
| D. | Hydro electric plant | 
| Answer» B. Base load plant | |
| 10. | _______ industry has the least power consumption per tonne of product. | 
| A. | Soap | 
| B. | Sugar | 
| C. | Vegetable oil | 
| D. | Caustic soda | 
| Answer» D. Caustic soda | |
| 11. | The expected useful life of an hydroelectric power station is around | 
| A. | 15 years | 
| B. | 30 years | 
| C. | 60 years | 
| D. | 100 years | 
| Answer» E. | |
| 12. | Which of the following place is not associated with nuclear power plants in India ? | 
| A. | Narora | 
| B. | Tarapur | 
| C. | Kota | 
| D. | Benglore | 
| Answer» E. | |
| 13. | Annual operating expenditure of a power plant consists of | 
| A. | fixed charges | 
| B. | semi-fixed charges | 
| C. | running charges | 
| D. | all of the above | 
| Answer» E. | |
| 14. | The efficiency of a plant is of least concern when it is selected as | 
| A. | peak load plant | 
| B. | casual run plant | 
| C. | either (A) or (B) | 
| D. | base load plant | 
| Answer» D. base load plant | |
| 15. | Approximate estimation of power demand can be made by | 
| A. | Load survey method | 
| B. | Statistical methods | 
| C. | Mathematical method | 
| D. | All of the above | 
| Answer» E. | |
| 16. | Load curve is useful in deciding the | 
| A. | operating schedule of generating units | 
| B. | sizes of generating units | 
| C. | total installed capacity of the plant | 
| D. | all of the above | 
| Answer» E. | |
| 17. | Power plant having maximum demand more than the installed rated capacity will have utilisation factor | 
| A. | equal to unity | 
| B. | less than unity | 
| C. | more than unity | 
| D. | none of the above | 
| Answer» D. none of the above | |
| 18. | In two part tariff, variation in load factor will affect | 
| A. | fixed charges | 
| B. | operating or running charges | 
| C. | both (A) and (B) | 
| D. | either (A) or (B) | 
| Answer» C. both (A) and (B) | |
| 19. | In a distribution system, in order to improve power factor, the synchronous capacitors are installed | 
| A. | at the receiving end | 
| B. | at the sending end | 
| C. | either (A) or (B) | 
| D. | none of the above | 
| Answer» B. at the sending end | |
| 20. | Which of the following is the disadvantage of a synchronous condenser ? | 
| A. | High maintenance cost | 
| B. | Continuous losses in motor | 
| C. | Noise | 
| D. | All of the above | 
| Answer» E. | |
| 21. | A synchronous condenser is virtually which of the following? | 
| A. | Induction motor | 
| B. | Under excited synchronous motor | 
| C. | Over excited synchronous motor | 
| D. | D.C. generator | 
| Answer» D. D.C. generator | |
| 22. | Generators for peak load plants are usually designed for maximum efficiency at | 
| A. | 25 to 50 percent full load | 
| B. | 50 to 75 percent full load | 
| C. | full load | 
| D. | 25 percent overload | 
| Answer» C. full load | |
| 23. | Large capacity generators are invariably | 
| A. | water cooled | 
| B. | natural air cooled | 
| C. | forced air cooled | 
| D. | hydrogen cooled | 
| Answer» E. | |
| 24. | In ______ fuel transportation cost is least. | 
| A. | nuclear power plants | 
| B. | diesel generating plants | 
| C. | steam power stations | 
| D. | none of the above | 
| Answer» B. diesel generating plants | |
| 25. | Which of the following plants is almost inevitably used as base load plant ? | 
| A. | Diesel engine plant | 
| B. | Gas turbine plant | 
| C. | Nuclear power plant | 
| D. | Pumped storage plant | 
| Answer» D. Pumped storage plant | |
| 26. | Most efficient plants are normally used as | 
| A. | peak load plants | 
| B. | base load plants | 
| C. | either (A) or (B) | 
| D. | none of the above | 
| Answer» C. either (A) or (B) | |
| 27. | For high value of diversity factor, a power station of given installed capacity will be in a position to supply | 
| A. | Less number of consumers | 
| B. | More number of consumers | 
| C. | Neither (A) nor (B) | 
| D. | Either (A) or (B) | 
| Answer» C. Neither (A) nor (B) | |
| 28. | Can generate power at unpredictable or uncontrolled times, | 
| A. | Solar power plant | 
| B. | Tidal power plant | 
| C. | Wind power plant | 
| D. | Any of the above | 
| Answer» E. | |
| 29. | Salvage value of the plant is always | 
| A. | positive | 
| B. | negative | 
| C. | zero | 
| D. | any of the above | 
| Answer» E. | |
| 30. | Which of the following is not an operating cost ? | 
| A. | Maintenance cost | 
| B. | Fuel cost | 
| C. | Salaries of high officials | 
| D. | Salaries of operating staff | 
| Answer» D. Salaries of operating staff | |
| 31. | For any type of consumer the ideal tariff is | 
| A. | two part tariff | 
| B. | three part tariff | 
| C. | block rate tariff | 
| D. | any of the above | 
| Answer» C. block rate tariff | |
| 32. | Which of the following are not repayable after a stipulated period ? | 
| A. | Shares | 
| B. | Fixed deposits | 
| C. | Cash certificates | 
| D. | Bonds | 
| Answer» B. Fixed deposits | |
| 33. | A company can raise funds through | 
| A. | fixed deposits | 
| B. | shares | 
| C. | bonds | 
| D. | any of the above | 
| Answer» E. | |
| 34. | Maximum demand on a power plant is | 
| A. | the greatest of all ?short time interval averaged? demand during a period | 
| B. | instantaneous maximum value of kVA supplied during a period | 
| C. | both (A) or (B) | 
| D. | none of the above | 
| Answer» B. instantaneous maximum value of kVA supplied during a period | |
| 35. | In an interconnected system, the diversity factor of the whole system | 
| A. | remains unchanged | 
| B. | decreases | 
| C. | increases | 
| D. | none of the above | 
| Answer» D. none of the above | |
| 36. | Which of the following is the essential requirement of peak load plant? | 
| A. | It should run at high speed | 
| B. | It should produce high voltage | 
| C. | It should be small in size | 
| D. | It should be capable of starting quickly | 
| Answer» E. | |
| 37. | A power transformer is usually rated in | 
| A. | kW | 
| B. | kVAR | 
| C. | kWh | 
| D. | kVA | 
| Answer» E. | |
| 38. | Power plant is expected to have the longest life. | 
| A. | Steam | 
| B. | Diesel | 
| C. | Hydroelectric | 
| D. | Any of the above | 
| Answer» D. Any of the above | |
| 39. | Load curve helps in deciding | 
| A. | total installed capacity of the plant | 
| B. | sizes of the generating units | 
| C. | operating schedule of generating units | 
| D. | all of the above | 
| Answer» E. | |
| 40. | Is the reserved generating capacity available for service under emergency conditions which is not kept in operation but in working order, | 
| A. | Hot reserve | 
| B. | Cold reserve | 
| C. | Spinning reserve | 
| D. | Firm power | 
| Answer» C. Spinning reserve | |
| 41. | Annual depreciation of the plant it proportional to the earning capacity of the plant vide | 
| A. | sinking fund depreciation | 
| B. | straight line depreciation | 
| C. | reducing balances depreciation | 
| D. | none of the above | 
| Answer» D. none of the above | |
| 42. | For a power plant which of the following constitutes running cost? | 
| A. | Cost of wages | 
| B. | Cost of fuel | 
| C. | Cost of lubricants | 
| D. | All of the above | 
| Answer» E. | |
| 43. | ________ will be least affected due to charge in supply voltage frequency. | 
| A. | Electric clock | 
| B. | Mixer grinder | 
| C. | Ceiling fan | 
| D. | Room heater | 
| Answer» E. | |
| 44. | ________ is invariably used for peak load | 
| A. | Nuclear power plant | 
| B. | Steam turbine plant | 
| C. | Pumped storage plant | 
| D. | None of the above | 
| Answer» D. None of the above | |
| 45. | For a diesel generating station the useful life is expected to be around | 
| A. | 15 to 20 years | 
| B. | 20 to 50 years | 
| C. | 50 to 75 years | 
| D. | 75 to 100 years | 
| Answer» B. 20 to 50 years | |
| 46. | public sector undertaking is associated with erection and sometimes running of thermal power plants | 
| A. | NTPC | 
| B. | SAIL | 
| C. | BEL | 
| D. | BHEL | 
| Answer» B. SAIL | |
| 47. | Generating capacity connected to the bus bars and ready to take load when switched on is known as | 
| A. | firm power | 
| B. | cold reserve | 
| C. | hot reserve | 
| D. | spinning reserve | 
| Answer» E. | |
| 48. | Load factor of a power station is defined as | 
| A. | maximum demand/average load | 
| B. | average load x maximum demand | 
| C. | average load/maximum demand | 
| D. | (average load x maximum demand)172 | 
| Answer» D. (average load x maximum demand)172 | |
| 49. | The load factor of domestic load is usually | 
| A. | 10 to 15% | 
| B. | 30 to 40% | 
| C. | 50 to 60% | 
| D. | 60 to 70% | 
| Answer» B. 30 to 40% | |
| 50. | Load factor of a power station is generally | 
| A. | equal to unity | 
| B. | less than unity | 
| C. | more than unity | 
| D. | equal to zero Diversity factor is always | 