Explore topic-wise MCQs in Irrigation Engineering.

This section includes 10 Mcqs, each offering curated multiple-choice questions to sharpen your Irrigation Engineering knowledge and support exam preparation. Choose a topic below to get started.

1.

How many river training works are needed on the canal head works?

A. 5
B. 3
C. 4
D. 2
Answer» C. 4
2.

Depending on how many considerations the capacity of under sluices is fixed?

A. 5
B. 4
C. 2
D. 3
Answer» E.
3.

Which device is used for silt removal after it enters the canal?

A. Silt Excluder
B. Silt Ejector
C. Weir
D. Barrage
Answer» C. Weir
4.

What device is placed in front of head regulator for silt removal?

A. Weir
B. Silt Extractor
C. Silt Excluder
D. Barrage
Answer» D. Barrage
5.

By constructing which structure we can help the fish in their migration?

A. Scouring Sluices
B. Silt Excluder
C. Fish Ladder
D. Divide Wall
Answer» D. Divide Wall
6.

Head regulator helps in controlling the flow in the canal.

A. False
B. True
Answer» C.
7.

Divide wall helps in concentrating scouring action.

A. True
B. False
Answer» B. False
8.

What does the diagram represent?

A. Divide Wall
B. Plan of Fish Ladder
C. Scouring Sluices
D. Canal Head Regulator
Answer» C. Scouring Sluices
9.

In order to find the proper location for the head works on the river, the river is divided into how many stages?

A. 5
B. 2
C. 3
D. 4
Answer» E.
10.

Into how many components the diversion headwork is divided?

A. 8
B. 5
C. 4
D. 7
Answer» B. 5