

MCQOPTIONS
Saved Bookmarks
This section includes 21 Mcqs, each offering curated multiple-choice questions to sharpen your Environmental Engineering knowledge and support exam preparation. Choose a topic below to get started.
1. |
The manhole in which vertical pipe is used for the transfer of sewage from branch to main sewer is __________ |
A. | Deep manhole |
B. | Ramp |
C. | Drop manhole |
D. | Normal manhole |
Answer» D. Normal manhole | |
2. |
The minimum diameter of the working chamber for a circular manhole is __________ |
A. | 0.8m |
B. | 0.9m |
C. | 1m |
D. | 1.2m |
Answer» E. | |
3. |
The thickness of the manhole frame is __________ |
A. | 10cm |
B. | 15cm |
C. | 20cm |
D. | 40cm |
Answer» D. 40cm | |
4. |
The manhole in which inclined pipe for transfer of sewage from branch to main sewer is __________ |
A. | Deep manhole |
B. | Ramp |
C. | Drop manhole |
D. | Normal manhole |
Answer» C. Drop manhole | |
5. |
The minimum diameter of the access shaft for a circular manhole is __________ |
A. | 60cm |
B. | 20cm |
C. | 30cm |
D. | 10cm |
Answer» B. 20cm | |
6. |
The minimum thickness of the side wall of the manhole is __________ |
A. | 50mm |
B. | 100mm |
C. | 225mm |
D. | 300mm |
Answer» D. 300mm | |
7. |
THE_THICKNESS_OF_THE_MANHOLE_FRAME_IS?$ |
A. | 10cm |
B. | 15cm |
C. | 20cm |
D. | 40cm |
Answer» D. 40cm | |
8. |
The manhole in which vertical pipe is used for the transfer of sewage from branch to main sewer is$ |
A. | Deep manhole |
B. | Ramp |
C. | Drop manhole |
D. | Normal manhole |
Answer» D. Normal manhole | |
9. |
The_minimum_diameter_of_working_chamber_for_a_circular_manhole_is$ |
A. | 0.8m |
B. | 0.9m |
C. | 1m |
D. | 1.2m |
Answer» E. | |
10. |
Which device is used to prevent the clogging of sewer pipes? |
A. | Flushing tank |
B. | Drop manhole |
C. | Lamp hole |
D. | Storm regulators |
Answer» B. Drop manhole | |
11. |
________ removes oil and grease from the sewage. |
A. | Catch basin |
B. | Gullies |
C. | Grease and oil traps |
D. | Storm regulators |
Answer» D. Storm regulators | |
12. |
Which sewer appurtenance is used for removing rainwater from the roads? |
A. | Catch basin |
B. | Gullies |
C. | Lamp hole |
D. | Storm regulators |
Answer» C. Lamp hole | |
13. |
Which sewer appurtenance allows lamp in the sewer? |
A. | Catch basin |
B. | Drop manhole |
C. | Lamp hole |
D. | Storm regulators |
Answer» D. Storm regulators | |
14. |
The manhole in which inclined pipe for transfer of sewage from branch to main sewer i? |
A. | Deep manhole |
B. | Ramp |
C. | Drop manhole |
D. | Normal manhole |
Answer» C. Drop manhole | |
15. |
The minimum diameter of the access shaft for a circular manhole is |
A. | 60cm |
B. | 20cm |
C. | 30cm |
D. | 10cm |
Answer» B. 20cm | |
16. |
Into how many types manholes are classified on the basis of depth of manhole? |
A. | 3 |
B. | 5 |
C. | 6 |
D. | 7 |
Answer» B. 5 | |
17. |
If the depth of excavation is 4m. What is the thickness of the brick wall of manhole? |
A. | 12cm |
B. | 16cm |
C. | 20cm |
D. | 26cm |
Answer» E. | |
18. |
Which of the following is situated above the working chamber in a deep manhole? |
A. | Main sewer |
B. | Access shaft |
C. | Branch sewer |
D. | Channel |
Answer» C. Branch sewer | |
19. |
The minimum thickness of the side wall of the manhole is |
A. | 50mm |
B. | 100mm |
C. | 225mm |
D. | 300mm |
Answer» D. 300mm | |
20. |
______ provides the working space for maintenance and inspection of sewers. |
A. | Lamp holes |
B. | Manholes |
C. | Flushing tanks |
D. | Working chamber |
Answer» E. | |
21. |
Which of the following is not a sewer appurtenance? |
A. | Storm regulator |
B. | Flushing tank |
C. | Water tank |
D. | Manholes |
Answer» D. Manholes | |