Explore topic-wise MCQs in Civil Engineering Drawing.

This section includes 9 Mcqs, each offering curated multiple-choice questions to sharpen your Civil Engineering Drawing knowledge and support exam preparation. Choose a topic below to get started.

1.

A _____________ houses the squatting pan or toilet seat and provides privacy and protection from the weather for the user.

A. roof
B. terrace
C. shade
D. shelter
Answer» E.
2.

As a very general guideline it is recommended that the bottom of the pit should be at least _______ above groundwater level.

A. 0.5 m
B. 2 m
C. 12 m
D. 20 m
Answer» C. 12 m
3.

As of 2013 pit latrines are used by an estimated ____________ people.

A. 1.77 billion
B. 2.77 million
C. 1.77 billion
D. 4.66 billion
Answer» D. 4.66 billion
4.

The size of the faeces drop hole in the floor or slab should not be larger than ____________

A. 5m
B. 25 cm
C. 45 cm
D. 250 mm
Answer» C. 45 cm
5.

The pit is typically at least ____________ deep and ___________ across.

A. 14 meters, 10 m
B. 30 meters, 15 m
C. 3 meters, 1 m
D. 11 meters, 9 m
Answer» D. 11 meters, 9 m
6.

A _________ is a type of toilet that collects human faeces in a hole in the ground.

A. gutter
B. septic tank
C. pit toilet
D. latrine
Answer» D. latrine
7.

Connecting pipe should be _______ mm minimum diameter.

A. 60
B. 300
C. 700
D. 100
Answer» B. 300
8.

The term septic refers to ____________

A. anaerobic bacterial environment that develops in the tank
B. refers to safety and precaution
C. drainage of waste materials
D. aerobic bacterial environment that develops in the tank
Answer» B. refers to safety and precaution
9.

A __________ is a chamber made of concrete, fiberglass, PVC or plastic, through which domestic wastewater, sewage flows for primary treatment.

A. drainage tank
B. pit latrine tank
C. harvesting water tank
D. septic tank
Answer» E.