			MCQOPTIONS
 Saved Bookmarks
				This section includes 9 Mcqs, each offering curated multiple-choice questions to sharpen your Civil Engineering Drawing knowledge and support exam preparation. Choose a topic below to get started.
| 1. | A _____________ houses the squatting pan or toilet seat and provides privacy and protection from the weather for the user. | 
| A. | roof | 
| B. | terrace | 
| C. | shade | 
| D. | shelter | 
| Answer» E. | |
| 2. | As a very general guideline it is recommended that the bottom of the pit should be at least _______ above groundwater level. | 
| A. | 0.5 m | 
| B. | 2 m | 
| C. | 12 m | 
| D. | 20 m | 
| Answer» C. 12 m | |
| 3. | As of 2013 pit latrines are used by an estimated ____________ people. | 
| A. | 1.77 billion | 
| B. | 2.77 million | 
| C. | 1.77 billion | 
| D. | 4.66 billion | 
| Answer» D. 4.66 billion | |
| 4. | The size of the faeces drop hole in the floor or slab should not be larger than ____________ | 
| A. | 5m | 
| B. | 25 cm | 
| C. | 45 cm | 
| D. | 250 mm | 
| Answer» C. 45 cm | |
| 5. | The pit is typically at least ____________ deep and ___________ across. | 
| A. | 14 meters, 10 m | 
| B. | 30 meters, 15 m | 
| C. | 3 meters, 1 m | 
| D. | 11 meters, 9 m | 
| Answer» D. 11 meters, 9 m | |
| 6. | A _________ is a type of toilet that collects human faeces in a hole in the ground. | 
| A. | gutter | 
| B. | septic tank | 
| C. | pit toilet | 
| D. | latrine | 
| Answer» D. latrine | |
| 7. | Connecting pipe should be _______ mm minimum diameter. | 
| A. | 60 | 
| B. | 300 | 
| C. | 700 | 
| D. | 100 | 
| Answer» B. 300 | |
| 8. | The term septic refers to ____________ | 
| A. | anaerobic bacterial environment that develops in the tank | 
| B. | refers to safety and precaution | 
| C. | drainage of waste materials | 
| D. | aerobic bacterial environment that develops in the tank | 
| Answer» B. refers to safety and precaution | |
| 9. | A __________ is a chamber made of concrete, fiberglass, PVC or plastic, through which domestic wastewater, sewage flows for primary treatment. | 
| A. | drainage tank | 
| B. | pit latrine tank | 
| C. | harvesting water tank | 
| D. | septic tank | 
| Answer» E. | |