1. |
The savings in annual road user costs, annual savings in accident costs and capital cost of Improvement are parameters used in ___________ |
A. | annual cost method |
B. | rate of return method |
C. | benefit cost ratio |
D. | capital recovery fund |
Answer» C. benefit cost ratio | |
2. |
What does CRF denote? |
A. | Central Research Fund |
B. | Central Road Fund |
C. | Capital Recovery Factor |
D. | Capital Recovery Fund |
Answer» D. Capital Recovery Fund | |
3. |
The average annual highway cost for a road system may be summed up by ________ |
A. | Ca=H |
B. | Ca=H+T |
C. | Ca=H+T+M-Cr |
D. | Ca=H+T+M-Cr |
Answer» E. | |
4. |
The ICPB type of pavement uses _____________ |
A. | concrete paver blocks |
B. | fly ash |
C. | rms |
D. | ggbs |
Answer» B. fly ash | |
5. |
The maximum stress sustained by concrete pavements in kg/cm2 is _________ |
A. | 45 |
B. | 30 |
C. | 25 |
D. | 15 |
Answer» B. 30 | |