Explore topic-wise MCQs in Irrigation Engineering.

This section includes 5 Mcqs, each offering curated multiple-choice questions to sharpen your Irrigation Engineering knowledge and support exam preparation. Choose a topic below to get started.

1.

The type of canal alignment which involves maximum CD works is a ______________

A. ridge canal
B. contour canal
C. side slope canal
D. both ridge and contour canal
Answer» C. side slope canal
2.

In order to reduce the CD works, the artificial canals are generally aligned along the ridgeline.

A. True
B. False
Answer» B. False
3.

Inlets and Outlets are inferior to aqueduct or super-passage type of work.

A. True
B. False
Answer» B. False
4.

The relative bed levels of the canal and the drainage may be changed and manipulated by _________________

A. changing the alignment
B. changing the positions of the water table
C. altering the head level
D. use of dewatering equipment
Answer» B. changing the positions of the water table
5.

The canal alignment is finalized only after finalizing the CD works.

A. True
B. False
Answer» B. False