This section includes 5 Mcqs, each offering curated multiple-choice questions to sharpen your Petroleum Production Operations knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
Which of the following is correct regarding the Swivel? |
| A. | It is thick, stranded metal cable threaded through the two blocks |
| B. | It is the top end of the kelly that allows the rotation of the drill string |
| C. | It is the stationary end of the block and tackle |
| D. | Set inside liner |
| Answer» C. It is the stationary end of the block and tackle | |
| 2. |
Which of the following is correct regarding the Drill line? |
| A. | It is thick, stranded metal cable threaded through the two blocks |
| B. | Used inside packer |
| C. | It is the stationary end of the block and tackle |
| D. | Set inside liner |
| Answer» B. Used inside packer | |
| 3. |
Which of the following is correct regarding the Crown block? |
| A. | It is a section of large diameter pipe fitted to the top of the BOP |
| B. | Used inside packer |
| C. | It is the stationary end of the block and tackle |
| D. | Set inside liner |
| Answer» D. Set inside liner | |
| 4. |
Which of the following is correct regarding the Bell nipple? |
| A. | It is a section of large diameter pipe fitted to the top of the BOP |
| B. | Used inside packer |
| C. | Used inside side pocket mandrel |
| D. | Set inside liner |
| Answer» B. Used inside packer | |
| 5. |
A Production Rig is a type of rig that is used on a producing wellhead platform. |
| A. | True |
| B. | False |
| Answer» B. False | |