

MCQOPTIONS
Saved Bookmarks
This section includes 8 Mcqs, each offering curated multiple-choice questions to sharpen your Statistical Quality Control knowledge and support exam preparation. Choose a topic below to get started.
1. |
IF_TYPE_II_ERROR_PROBABILITY_FOR_A_PROCESS_IS_0.8594,_ITS_ARL_WILL_BE_____?$ |
A. | 8 |
B. | 1 |
C. | 3 |
D. | 7 |
Answer» E. | |
2. |
The gap between the UCL and LCL is double the gap between either one of them and the Center line, for the standardized chart.$ |
A. | True |
B. | False |
Answer» B. False | |
3. |
We cannot analyze abnormal runs or patterns directly, on p-chart with variable sample size.$ |
A. | True |
B. | False |
Answer» B. False | |
4. |
If the for a fraction nonconforming chart, the probability of a sample point plotting out of control is 0.0531, what will be the ARL for this? |
A. | 12.31 |
B. | 8.16 |
C. | 18.83 |
D. | 22.78 |
Answer» D. 22.78 | |
5. |
An OC curve is a display of ____ |
A. | β Error against defectives in a process output over a limited period of time |
B. | β Error against time |
C. | β Error against the process fraction nonconforming |
D. | Fraction nonconforming against β Error |
Answer» D. Fraction nonconforming against ‚âà√≠‚Äö√¢¬ß Error | |
6. |
A type II error is also called a ____ |
A. | α Error |
B. | δ Error |
C. | β Error |
D. | ‚àÖ Error |
Answer» D. ‚Äö√Ñ√∂‚àö‚Ć‚àö√± Error | |
7. |
To deal with the variable sample size, the standardized chart is used, which has its upper limit at ____ |
A. | 3 |
B. | -3 |
C. | 1 |
D. | 0 |
Answer» B. -3 | |
8. |
The standardized control chart has the center line at ___ |
A. | 1 σ |
B. | 2 σ |
C. | Zero |
D. | -1σ |
Answer» D. -1‚âà√¨‚àö√¢ | |