This section includes 8 Mcqs, each offering curated multiple-choice questions to sharpen your Geotechnical Engineering knowledge and support exam preparation. Choose a topic below to get started.
1. |
The dimension of the bulb in an under-reamed pile can be checked by __________ |
A. | Meter scale |
B. | G.I pipe assembly |
C. | Auger |
D. | Under-reamer |
Answer» C. Auger | |
2. |
Pile groups in under-reamed pile foundation can be tested by means of _________ |
A. | Free standing piles and Pile foundation |
B. | Cannot be tested |
C. | None of the mentioned |
D. | All of the mentioned |
Answer» B. Cannot be tested | |
3. |
Enlarging the stem of bore hole at the depth is done by using________ |
A. | Spiral auger |
B. | Under-reamer |
C. | Boring guide |
D. | None of the mentioned |
Answer» C. Boring guide | |
4. |
In the process of pile foundation, boring is done with the help of _________ |
A. | Boring guide |
B. | Under-reamer |
C. | Spiral auger |
D. | Pile beams |
Answer» D. Pile beams | |
5. |
Routine tests are usually carried out on _________ |
A. | Test piles |
B. | Working piles |
C. | None of the mentioned |
D. | All of the mentioned |
Answer» C. None of the mentioned | |
6. |
The depth of the bore hole is checked at _________ before insertion of the under-reamer. |
A. | At the start and At the end |
B. | Each time |
C. | None of the mentioned |
D. | All of the mentioned |
Answer» B. Each time | |
7. |
The use of bore guide in under-reamed pile foundation is essential for __________ |
A. | To drill the bore hole |
B. | To provide a support to the pile |
C. | To keep the bore holes vertical |
D. | To set the guide assembly in position |
Answer» D. To set the guide assembly in position | |
8. |
The equipment required for construction of a under-reamed pile is________ |
A. | Auger boring guide |
B. | Spiral auger |
C. | Concreting funnel |
D. | All of the mentioned |
Answer» E. | |