This section includes 8 Mcqs, each offering curated multiple-choice questions to sharpen your Geotechnical Engineering knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
The dimension of the bulb in an under-reamed pile can be checked by __________ |
| A. | Meter scale |
| B. | G.I pipe assembly |
| C. | Auger |
| D. | Under-reamer |
| Answer» C. Auger | |
| 2. |
Pile groups in under-reamed pile foundation can be tested by means of _________ |
| A. | Free standing piles and Pile foundation |
| B. | Cannot be tested |
| C. | None of the mentioned |
| D. | All of the mentioned |
| Answer» B. Cannot be tested | |
| 3. |
Enlarging the stem of bore hole at the depth is done by using________ |
| A. | Spiral auger |
| B. | Under-reamer |
| C. | Boring guide |
| D. | None of the mentioned |
| Answer» C. Boring guide | |
| 4. |
In the process of pile foundation, boring is done with the help of _________ |
| A. | Boring guide |
| B. | Under-reamer |
| C. | Spiral auger |
| D. | Pile beams |
| Answer» D. Pile beams | |
| 5. |
Routine tests are usually carried out on _________ |
| A. | Test piles |
| B. | Working piles |
| C. | None of the mentioned |
| D. | All of the mentioned |
| Answer» C. None of the mentioned | |
| 6. |
The depth of the bore hole is checked at _________ before insertion of the under-reamer. |
| A. | At the start and At the end |
| B. | Each time |
| C. | None of the mentioned |
| D. | All of the mentioned |
| Answer» B. Each time | |
| 7. |
The use of bore guide in under-reamed pile foundation is essential for __________ |
| A. | To drill the bore hole |
| B. | To provide a support to the pile |
| C. | To keep the bore holes vertical |
| D. | To set the guide assembly in position |
| Answer» D. To set the guide assembly in position | |
| 8. |
The equipment required for construction of a under-reamed pile is________ |
| A. | Auger boring guide |
| B. | Spiral auger |
| C. | Concreting funnel |
| D. | All of the mentioned |
| Answer» E. | |